Suivre
Najib Mohamed Najid
Najib Mohamed Najid
Adresse e-mail validée de univ-nantes.fr
Titre
Citée par
Citée par
Année
Single item lot sizing problems
N Brahimi, S Dauzere-Peres, NM Najid, A Nordli
European Journal of Operational Research 168 (1), 1-16, 2006
5192006
Integrated production planning and preventive maintenance in deteriorating production systems
EH Aghezzaf, NM Najid
Information Sciences 178 (17), 3382-3392, 2008
1622008
Models for robust tactical planning in multi-stage production systems with uncertain demands
EH Aghezzaf, C Sitompul, NM Najid
Computers & Operations Research 37 (5), 880-889, 2010
1202010
An integrated production and maintenance planning model with time windows and shortage cost
NM Najid, M Alaoui-Selsouli, A Mohafid
International journal of production research 49 (8), 2265-2283, 2011
1162011
A modified simulated annealing method for flexible job shop scheduling problem
NM Najid, S Dauzere-Peres, A Zaidat
IEEE international conference on systems, man and cybernetics 5, 6 pp. vol. 5, 2002
932002
Capacitated multi-item lot-sizing problems with time windows
N Brahimi, S Dauzère-Pérès, NM Najid
Operations Research 54 (5), 951-967, 2006
852006
Modularity in the design of reconfigurable manufacturing systems
K Lameche, NM Najid, P Castagna, K Kouiss
IFAC-PapersOnLine 50 (1), 3511-3516, 2017
512017
Lagrangian relaxation based heuristic for an integrated production and maintenance planning problem
M Alaoui-Selsouli, A Mohafid, NM Najid
International Journal of Production Research 50 (13), 3630-3642, 2012
232012
A new heuristic to solve RCPSP with multiple execution modes and Multi-Skilled Labor
Y Kadrou, NM Najid
The Proceedings of the Multiconference on" Computational Engineering in …, 2006
232006
The single-item lot sizing problem with time windows
S Dauzère-Pérès, N Brahimi, N Najid, A Nordli
Rapport de Recherche, 2002
232002
Integrated production and preventive maintenance in production systems subject to random failures
EH Aghezzaf, C Sitompul, N Najid
Actes de Mosim'08, 1-8, 2008
202008
Uncapacitated lot-sizing problems with time windows
S Dauzere-Péres, N Brahimi, NM Najid, A Nordli
École des Mines de Nantes Research Report, 2002
142002
An efficient algorithm for the multi-mode resource constrained project scheduling problem with resource flexibility
NM Najid, M Arroub
International Journal of Mathematics in Operational Research 2 (6), 748-761, 2010
132010
Tabu search algorithm for the MRCPSP with multi-skilled personnel
Y Kadrou, NM Najid
Computational Engineering in System Application, IMACS Multi Conference 2 (4 …, 2006
102006
Agent based approach for a real-time shop floor control
NM Najid, K Kouiss, O Derriche
IEEE International Conference on Systems, Man and Cybernetics 4, 6 pp. vol. 4, 2002
102002
Utilisation de l'approche multi-agents pour le pilotage en temps réel des systèmes de production
Y HAFRI, NM NAJID
Conception, analyse et gestion des sytèmes industriels (Troyes, 25-27 avril …, 2001
102001
System engineering-based methodology to design reconfigurable manufacturing systems
NM Najid, P Castagna, K Kouiss
Reconfigurable Manufacturing Systems: From Design to Implementation, 29-55, 2020
92020
Un couplage MES-simulation pour le pilotage d'un système de production
K Kouiss, NM Najid
5e Conférence Francophone de MOdélisation et SIMulation" Modélisation et …, 2004
82004
The storage space allocation problem in a dry bulk terminal: a heuristic solution
AA Ouhaman, K Benjelloun, JP Kenné, N Najid
IFAC-PapersOnLine 53 (2), 10822-10827, 2020
62020
On the integrated production, inventory and preventive maintenance problem in manufacturing systems with backorder
JP Kenne, A Gharbi, NM Najid
International Journal of Simulation and Process Modelling 5 (4), 300-312, 2009
62009
Le système ne peut pas réaliser cette opération maintenant. Veuillez réessayer plus tard.
Articles 1–20