Suivre
Majid Aminnayeri
Majid Aminnayeri
Associate Professor of Industrial Engineering, Amirkabir University of Technology
Adresse e-mail validée de aut.ac.ir
Titre
Citée par
Citée par
Année
Solving the integrated scheduling of production and rail transportation problem by Keshtel algorithm
M Hajiaghaei-Keshteli, M Aminnayeri
Applied Soft Computing 25, 184-203, 2014
1222014
Type II robotic assembly line balancing problem: An evolution strategies algorithm for a multi-objective model
A Yoosefelahi, M Aminnayeri, H Mosadegh, HD Ardakani
Journal of Manufacturing Systems 31 (2), 139-151, 2012
1222012
Scheduling open shops with parallel machines to minimize total completion time
B Naderi, SMTF Ghomi, M Aminnayeri, M Zandieh
Journal of Computational and Applied Mathematics 235 (5), 1275-1287, 2011
882011
Integrated scheduling of production and rail transportation
M Hajiaghaei-Keshteli, M Aminnayeri, SMTF Ghomi
Computers & Industrial Engineering 74, 240-256, 2014
762014
A high performing metaheuristic for job shop scheduling with sequence-dependent setup times
B Naderi, SMTF Ghomi, M Aminnayeri
Applied Soft Computing 10 (3), 703-710, 2010
742010
Keshtel Algorithm (KA); a new optimization algorithm inspired by Keshtels’ feeding
M Hajiaghaei-Keshteli, M Aminnayeri
Proceeding in IEEE conference on industrial engineering and management …, 2013
672013
A contribution and new heuristics for open shop scheduling
B Naderi, SMTF Ghomi, M Aminnayeri, M Zandieh
Computers & Operations Research 37 (1), 213-221, 2010
662010
Incorporating periodic preventive maintenance into flexible flowshop scheduling problems
B Naderi, M Zandieh, M Aminnayeri
Applied Soft Computing 11 (2), 2094-2101, 2011
592011
Comparison of different input selection algorithms in neuro-fuzzy modeling
M Alizadeh, F Jolai, M Aminnayeri, R Rada
Expert Systems with Applications 39 (1), 1536-1544, 2012
412012
A study on open shop scheduling to minimise total tardiness
B Naderi, SMT Fatemi Ghomi, M Aminnayeri, M Zandieh
International Journal of Production Research 49 (15), 4657-4678, 2011
382011
Multi-objective no-wait flowshop scheduling problems: models and algorithms
B Naderi, M Aminnayeri, M Piri, MH Ha'iri Yazdi
International Journal of Production Research 50 (10), 2592-2608, 2012
322012
Multistage portfolio optimization with stocks and options
H Davari‐Ardakani, M Aminnayeri, A Seifi
International Transactions in Operational Research 23 (3), 593-622, 2016
312016
An MLE approach for estimating the time of step changes in Poisson regression profiles
A Sharafi, M Aminnayeri, A Amiri
Scientia Iranica 20 (3), 855-860, 2013
292013
Modeling and scheduling open shops with sequence-dependent setup times to minimize total completion time
B Naderi, SMTF Ghomi, M Aminnayeri, M Zandieh
The International Journal of Advanced Manufacturing Technology 53, 751-760, 2011
272011
Identifying the time of step change in binary profiles
A Sharafi, M Aminnayeri, A Amiri
The International Journal of Advanced Manufacturing Technology 63, 209-214, 2012
232012
Risk-adjusted Bernoulli chart in multi-stage healthcare processes based on state-space model with a latent risk variable and dynamic probability control limits
F Sogandi, M Aminnayeri, A Mohammadpour, A Amiri
Computers & Industrial Engineering 130, 699-713, 2019
212019
Statistical monitoring of polytomous logistic profiles in phase II
R Noorossana, M Aminnayeri, H Izadbakhsh
Scientia Iranica 20 (3), 958-966, 2013
192013
Optimizing the admission time of outbound trucks entering a cross-dock with uniform arrival time by considering a queuing model
A Motaghedi-Larijani, M Aminnayeri
Engineering Optimization 49 (3), 466-480, 2017
182017
Process capability indices for logistic regression profile
M Rezaye Abbasi Charkhi, M Aminnayeri, A Amiri
Quality and Reliability Engineering International 32 (5), 1655-1661, 2016
182016
A novel discrete league championship algorithm for minimizing earliness/tardiness penalties with distinct due dates and batch delivery consideration
Z Pourali, M Aminnayeri
Advanced Intelligent Computing: 7th International Conference, ICIC 2011 …, 2012
152012
Le système ne peut pas réaliser cette opération maintenant. Veuillez réessayer plus tard.
Articles 1–20