Stéphane Dauzère-Pérès
Title
Cited by
Cited by
Year
A literature review on the impact of RFID technologies on supply chain management
A Sarac, N Absi, S Dauzère-Pérès
International journal of production economics 128 (1), 77-95, 2010
6202010
Single item lot sizing problems
N Brahimi, S Dauzere-Peres, NM Najid, A Nordli
European Journal of Operational Research 168 (1), 1-16, 2006
4302006
An integrated approach for modeling and solving the general multiprocessor job-shop scheduling problem using tabu search
S Dauzère-Pérès, J Paulli
Annals of Operations Research 70, 281-306, 1997
4241997
A survey of problems, solution techniques, and future challenges in scheduling semiconductor manufacturing operations
L Mönch, JW Fowler, S Dauzere-Peres, SJ Mason, O Rose
Journal of scheduling 14 (6), 583-599, 2011
2782011
Lot sizing with carbon emission constraints
N Absi, S Dauzère-Pérès, S Kedad-Sidhoum, B Penz, C Rapine
European Journal of Operational Research 227 (1), 55-61, 2013
2492013
Routing trains through railway stations: Model formulation and algorithms
PJ Zwaneveld, LG Kroon, HE Romeijn, M Salomon, S Dauzere-Peres, ...
Transportation science 30 (3), 181-194, 1996
2151996
A genetic local search algorithm for minimizing total weighted tardiness in the job-shop scheduling problem
I Essafi, Y Mati, S Dauzère-Pérès
Computers & Operations Research 35 (8), 2599-2616, 2008
1842008
A modified shifting bottleneck procedure for job-shop scheduling
S Dauzere-Peres, JB Lasserre
The international journal of production research 31 (4), 923-932, 1993
1711993
Genetic algorithms to minimize the weighted number of late jobs on a single machine
M Sevaux, S Dauzère-Pérès
European journal of operational research 151 (2), 296-306, 2003
1342003
Multi-resource shop scheduling with resource flexibility
S Dauzère-Pérès, W Roux, JB Lasserre
European Journal of Operational Research 107 (2), 289-305, 1998
1301998
Solving the discrete lotsizing and scheduling problem with sequence dependent set-up costs and set-up times using the travelling salesman problem with time windows
M Salomon, MM Solomon, LN Van Wassenhove, Y Dumas, ...
European Journal of Operational Research 100 (3), 494-513, 1997
1181997
Flexibility and robustness in scheduling
JC Billaut, A Moukrim, E Sanlaville
John Wiley & Sons, 2013
1102013
An integrated approach in production planning and scheduling
S Dauzère-Péres, JB Lasserre
Springer Science & Business Media, 2012
972012
An integrated approach in production planning and scheduling
S Dauzère-Pérès, JB Lasserre
Lecture notes in economics and mathematical systems 411, 1994
97*1994
Integration of lotsizing and scheduling decisions in a job-shop
S Dauzere-Peres, JB Lasserre
European Journal of Operational Research 75 (2), 413-426, 1994
961994
Modelling and analysis of semiconductor manufacturing in a shrinking world: challenges and successes
CF Chien, S Dauzère-Pérès, H Ehm, JW Fowler, Z Jiang, ...
European Journal of Industrial Engineering 4 5 (3), 254-271, 2011
912011
Lot streaming in job-shop scheduling
S Dauzere-Peres, JB Lasserre
Operations Research 45 (4), 584-595, 1997
901997
A general approach for optimizing regular criteria in the job-shop scheduling problem
Y Mati, S Dauzère-Pérès, C Lahlou
European Journal of Operational Research 212 (1), 33-42, 2011
852011
A modified simulated annealing method for flexible job shop scheduling problem
NM Najid, S Dauzere-Peres, A Zaidat
IEEE international conference on systems, man and cybernetics 5, 6 pp. vol. 5, 2002
852002
A two-phase iterative heuristic approach for the production routing problem
N Absi, C Archetti, S Dauzère-Pérès, D Feillet
Transportation Science 49 (4), 784-795, 2015
772015
The system can't perform the operation now. Try again later.
Articles 1–20