Multimodal hub location and hub network design SA Alumur, BY Kara, OE Karasan Omega 40 (6), 927-939, 2012 | 280 | 2012 |
The robust spanning tree problem with interval data H Yaman, OE Karaşan, MÇ Pınar Operations research letters 29 (1), 31-40, 2001 | 230 | 2001 |
The design of single allocation incomplete hub networks SA Alumur, BY Kara, OE Karasan Transportation Research Part B: Methodological 43 (10), 936-951, 2009 | 221 | 2009 |
A tabu-search based heuristic for the hub covering problem over incomplete hub networks H Calık, SA Alumur, BY Kara, OE Karasan Computers & Operations Research 36 (12), 3088-3096, 2009 | 194 | 2009 |
The robust shortest path problem with interval data OE Karaчsan, MC Pinar, H Yaman | 169 | 2003 |
A Benders decomposition approach for the charging station location problem with plug-in hybrid electric vehicles O Arslan, OE Karaşan Transportation Research Part B: Methodological 93, 670-695, 2016 | 145 | 2016 |
A branch and price approach for routing and refueling station location model B Yıldız, O Arslan, OE Karaşan European Journal of Operational Research 248 (3), 815-826, 2016 | 140 | 2016 |
Cost and emission impacts of virtual power plant formation in plug-in hybrid electric vehicle penetrated networks O Arslan, OE Karasan Energy 60, 116-124, 2013 | 125 | 2013 |
Equational characterizations of Boolean function classes O Ekin, S Foldes, PL Hammer, L Hellerstein Discrete Mathematics 211 (1), 27-51, 2000 | 103 | 2000 |
A branch-and-price algorithm for the vehicle routing problem with roaming delivery locations G Ozbaygin, OE Karasan, M Savelsbergh, H Yaman Transportation Research Part B: Methodological 100, 115-137, 2017 | 101 | 2017 |
Debris removal during disaster response: A case for Turkey H Sahin, BY Kara, OE Karasan Socio-Economic Planning Sciences 53, 49-59, 2016 | 84 | 2016 |
Minimum cost path problem for plug-in hybrid electric vehicles O Arslan, B Yıldız, OE Karaşan Transportation Research Part E: Logistics and Transportation Review 80, 123-141, 2015 | 82 | 2015 |
Scheduling in a three-machine robotic flexible manufacturing cell H Gultekin, MS Akturk, OE Karasan Computers & operations research 34 (8), 2463-2477, 2007 | 75 | 2007 |
Release time scheduling and hub location for next-day delivery H Yaman, OE Karasan, BY Kara Operations research 60 (4), 906-917, 2012 | 72 | 2012 |
Solution methodologies for debris removal in disaster response N Berktaş, BY Kara, OE Karaşan EURO Journal on Computational Optimization 4 (3-4), 403-445, 2016 | 69 | 2016 |
Robotic cell scheduling with operational flexibility MS Akturk, H Gultekin, OE Karasan Discrete Applied Mathematics 145 (3), 334-348, 2005 | 64 | 2005 |
Multiple part-type scheduling in flexible robotic cells GD Batur, OE Karasan, MS Akturk International Journal of Production Economics 135 (2), 726-740, 2012 | 60 | 2012 |
Pure cycles in flexible robotic cells H Gultekin, OE Karasan, MS Akturk Computers & Operations Research 36 (2), 329-343, 2009 | 53 | 2009 |
Scheduling in robotic cells: process flexibility and cell layout H Gultekin, MS Akturk, OE Karasan International Journal of Production Research 46 (8), 2105-2121, 2008 | 52 | 2008 |
Cyclic scheduling of a 2-machine robotic cell with tooling constraints H Gultekin, MS Akturk, OE Karasan European Journal of Operational Research 174 (2), 777-796, 2006 | 52 | 2006 |