Talel Ladhari
Talel Ladhari
École Supérieure des Sciences Économiques et commerciales de Tunis, Université de Tunis
Aucune adresse e-mail validée
Titre
Citée par
Citée par
Année
A computational study of the permutation flow shop problem based on a tight lower bound
T Ladhari, M Haouari
Computers & Operations Research 32 (7), 1831-1847, 2005
812005
On the inventory performance of multi-criteria classification methods: empirical investigation
MZ Babai, T Ladhari, I Lajili
International Journal of Production Research 53 (1), 279-290, 2015
622015
A branch-and-bound-based local search method for the flow shop problem
M Haouari, T Ladhari
Journal of the Operational Research Society 54 (10), 1076-1084, 2003
502003
Multi-criteria inventory classification: new consensual procedures
T Ladhari, MZ Babai, I Lajili
IMA journal of Management Mathematics 27 (2), 335-351, 2016
272016
Minimising maximum lateness in a two-machine flowshop
M Haouari, T Ladhari
Journal of the Operational Research Society 51 (9), 1100-1106, 2000
232000
Minimizing the total completion time in a two-machine flowshop problem with time delays
L Msakni, Khallouli, Al-Salem
Engineering Optimization, 2015
21*2015
The two-machine flowshop scheduling problem with sequence-independent setup times: New lower bounding strategies
A Gharbi, T Ladhari, MK Msakni, M Serairi
European Journal of Operational Research 231 (1), 69-78, 2013
202013
Coupling Genetic Local Search and Recovering Beam Search algorithms for minimizing the total completion time in the single machine scheduling problem subject to release dates
MA Rakrouki, T Ladhari, V T’kindt
Computers & operations research 39 (6), 1257-1264, 2012
192012
Heuristics and lower bounds for minimizing the total completion time in a two-machine flowshop
T Ladhari, MA Rakrouki
International Journal of Production Economics 122 (2), 678-691, 2009
182009
Evolutionary multiobjective optimization for the multi-machine flow shop scheduling problem under blocking
N Nouri, T Ladhari
Annals of Operations Research 267 (1), 413-430, 2018
142018
Minimizing the total completion time in a two-machine flowshop with sequence-independent setup times
T Ladhari, MK Msakni, A Allahverdi
Journal of the Operational Research Society 63 (4), 445-459, 2012
132012
Solving the permutation flow shop problem with makespan criterion using grids
S Kouki, M Jemni
112011
A genetic algorithm-based classification approach for multicriteria ABC analysis
H Kaabi, K Jabeur, T Ladhari
International Journal of Information Technology & Decision Making 17 (06 …, 2018
102018
A load balanced distributed algorithm to solve the permutation flow shop problem using the grid
S Kouki, M Jemni, T Ladhari
2012 IEEE 15th International Conference on Computational Science and …, 2012
102012
A load balanced distributed algorithm to solve the permutation flow shop problem using the grid
S Kouki, M Jemni, T Ladhari
2012 IEEE 15th International Conference on Computational Science and …, 2012
102012
Deployment of solving permutation flow shop scheduling problem on the grid
S Kouki, M Jemni, T Ladhari
Grid and Distributed Computing, Control and Automation, 95-104, 2010
102010
Scalable distributed branch and bound for the permutation flow shop problem
S Kouki, M Jemni, T Ladhari
2013 Eighth International Conference on P2P, Parallel, Grid, Cloud and …, 2013
92013
A discrete artificial bee colony algorithm for resource-constrained project scheduling problem
N Nouri, S Krichen, T Ladhari, P Fatimah
2013 5th International Conference on Modeling, Simulation and Applied …, 2013
92013
A branch-and-bound algorithm for the two-machine total completion time flowshop problem subject to release dates
MA Rakrouki, A Kooli, S Chalghoumi, T Ladhari
Operational Research 20 (1), 21-35, 2020
82020
Inventory performance of multi-criteria classification methods: An empirical investigation
I Lajili, MZ Babai, T Ladhari
9th International Conference on Modeling, Optimization & SIMulation, 2012
72012
Le système ne peut pas réaliser cette opération maintenant. Veuillez réessayer plus tard.
Articles 1–20