Suivre
Javad Behnamian
Javad Behnamian
Associate Professor of Industrial Engineering, Bu-Ali Sina University
Adresse e-mail validée de basu.ac.ir - Page d'accueil
Titre
Citée par
Citée par
Année
Parallel-machine scheduling problems with sequence-dependent setup times using an ACO, SA and VNS hybrid algorithm
J Behnamian, M Zandieh, SMTF Ghomi
Expert Systems with Applications 36 (6), 9637-9644, 2009
1732009
A multi-phase covering Pareto-optimal front method to multi-objective scheduling in a realistic hybrid flowshop using a hybrid metaheuristic
J Behnamian, SMT Ghomi
Expert Systems with Applications 36 (8), 11057-11069, 2009
1682009
A survey of multi-factory scheduling
J Behnamian, SMT Fatemi Ghomi
Journal of Intelligent Manufacturing 27, 231-249, 2016
1512016
A discrete colonial competitive algorithm for hybrid flowshop scheduling to minimize earliness and quadratic tardiness penalties
J Behnamian, M Zandieh
Expert Systems with Applications 38 (12), 14490-14498, 2011
1302011
Hybrid flowshop scheduling with machine and resource-dependent processing times
J Behnamian, SMTF Ghomi
Applied Mathematical Modelling 35 (3), 1107-1123, 2011
1172011
Development of a PSO–SA hybrid metaheuristic for a new comprehensive regression model to time-series forecasting
J Behnamian, SMTF Ghomi
Expert Systems with applications 37 (2), 974-984, 2010
1102010
The heterogeneous multi-factory production network scheduling with adaptive communication policy and parallel machine
J Behnamian, SMTF Ghomi
Information Sciences 219, 181-196, 2013
992013
Decomposition based hybrid VNS–TS algorithm for distributed parallel factories scheduling with virtual corporation
J Behnamian
Computers & Operations Research 52, 181-191, 2014
632014
Multi-objective fuzzy multiprocessor flowshop scheduling
J Behnamian, SMTF Ghomi
Applied soft computing 21, 139-148, 2014
602014
Development of a hybrid metaheuristic to minimise earliness and tardiness in a hybrid flowshop with sequence-dependent setup times
J Behnamian, SMT Fatemi Ghomi, M Zandieh
International Journal of Production Research 48 (5), 1415-1438, 2010
522010
Survey on fuzzy shop scheduling
J Behnamian
Fuzzy Optimization and Decision Making 15 (3), 331–366, 2016
512016
Application of particle swarm optimization and simulated annealing algorithms in flow shop scheduling problem under linear deterioration
M Bank, SMTF Ghomi, F Jolai, J Behnamian
Advances in Engineering Software 47 (1), 1-6, 2012
482012
Minimizing makespan on a three-machine flowshop batch scheduling problem with transportation using genetic algorithm
J Behnamian, SMTF Ghomi, F Jolai, O Amirtaheri
Applied soft computing 12 (2), 768-777, 2012
462012
Lagrangian heuristic algorithm for green multi-product production routing problem with reverse logistics and remanufacturing
A Parchami Afra, J Behnamian
Journal of Manufacturing Systems 58, 33-43, 2021
402021
Earliness and tardiness minimizing on a realistic hybrid flowshop scheduling with learning effect by advanced metaheuristic
J Behnamian, M Zandieh
Arabian Journal for Science and Engineering 38, 1229-1242, 2013
402013
Due windows group scheduling using an effective hybrid optimization approach
J Behnamian, M Zandieh, SMT Fatemi Ghomi
The International Journal of Advanced Manufacturing Technology 46, 721-735, 2010
392010
Storage System Layout ( in Facility location: concepts, models, algorithms and case studies)
J Behnamian, B Eghtedari
Springer Science & Business Media, 2009
39*2009
Multi-objective Green Flowshop Scheduling Problem under Uncertainty: Estimation of Distribution Algorithm
M Faraji Amiri, J Behnamian
Journal of Cleaner Production, 119734, 2020
342020
Due window scheduling with sequence-dependent setup on parallel machines using three hybrid metaheuristic algorithms
J Behnamian, M Zandieh, SMT Fatemi Ghomi
The International Journal of Advanced Manufacturing Technology 44, 795-808, 2009
342009
A multi-phase covering Pareto-optimal front method to multi-objective parallel machine scheduling
J Behnamian, M Zandieh, SMT Fatemi Ghomi
International Journal of Production Research 48 (17), 4949-4976, 2010
322010
Le système ne peut pas réaliser cette opération maintenant. Veuillez réessayer plus tard.
Articles 1–20