Suivre
Elodie SUZANNE
Titre
Citée par
Citée par
Année
Towards circular economy in production planning: Challenges and opportunities
E Suzanne, N Absi, V Borodin
European Journal of Operational Research 287 (1), 168-190, 2020
1222020
A single-item lot-sizing problem with a by-product and inventory capacities
E Suzanne, N Absi, V Borodin, W van den Heuvel
European Journal of Operational Research 287 (3), 844-855, 2020
212020
Lot-sizing for industrial symbiosis
E Suzanne, N Absi, V Borodin, W van den Heuvel
Computers and Industrial Engineering 160, 2021
122021
Production planning for industrial symbiosis
E Suzanne
Mines Saint-Etienne, 2021
12021
Collaborative lot-sizing for industrial symbiosis
E Suzanne, N Absi, V Borodin, W van den Heuvel
2024
Industrial symbiosis coordination under asymmetric information via contracts: A game theory-based approach
E Suzanne, N Absi, V Borodin, W van den Heuvel
ROADEF 2022, 2022
2022
Collaborative lot-sizing in an industrial symbiosis context
E Suzanne, N Absi, V Borodin, W van den Heuvel
ROADEF 2021, 2021
2021
Production planning in an industrial symbiosis context
E Suzanne, N Absi, V Borodin, W van den Heuvel
ROADEF 2020, 2020
2020
A bi-level single-item lot-sizing problem for industrial symbiosis
E Suzanne, N Absi, V Borodin, W van den Heuvel
International Workshop on Lot-Sizing-IWLS’2019, 39, 2019
2019
Problème de lot-sizing intégrant la gestion des by-products
E Suzanne, N Absi, V Borodin, W van den Heuvel
ROADEF 2019, 2019
2019
A single-item lot-sizing problem with a by-product and inventory bounds
E Suzanne, N Absi, V Borodin, W van den Heuvel
International Workshop on Lot-Sizing 2018, 2018
2018
Production planning and circular economy: challenges and opportunities
É Suzanne, N Absi, V Borodin
ROADEF, 2018
2018
information via contracts: A game theory-based approach
É Suzanne, N Absi, V Borodin, W van den Heuvel
Le système ne peut pas réaliser cette opération maintenant. Veuillez réessayer plus tard.
Articles 1–13