Suivre
Hossein Iranmanesh
Hossein Iranmanesh
Affiliation inconnue
Aucune adresse e-mail validée
Titre
Citée par
Citée par
Année
A new hybrid enhanced local linear neuro-fuzzy model based on the optimized singular spectrum analysis and its application for nonlinear and chaotic time series forecasting
M Abdollahzade, A Miranian, H Hassani, H Iranmanesh
Information Sciences 295, 107-125, 2015
1002015
Finding Pareto optimal front for the multi-mode time, cost quality trade-off in project scheduling
H Iranmanesh, MR Skandari, M Allahverdiloo
World Academy of Science, Engineering and Technology 40 (1), 346-350, 2008
782008
Multi objective particle swarm optimization for a discrete time, cost and quality trade-off problem
M Rahimi, H Iranmanesh
World Applied Sciences Journal 4 (2), 270-276, 2008
762008
Competitive advantage by adjusting design characteristics to satisfy cost targets
H Iranmanesh, V Thomson
International Journal of Production Economics 115 (1), 64-71, 2008
532008
A management oriented approach to reduce a project duration and its risk (variability)
M Madadi, H Iranmanesh
European Journal of Operational Research 219 (3), 751-761, 2012
492012
Mid-term energy demand forecasting by hybrid neuro-fuzzy models
H Iranmanesh, M Abdollahzade, A Miranian
Energies 5 (1), 1-21, 2011
382011
A scheduling model for serial jobs on parallel machines with different preventive maintenance (PM)
SN Mirabedini, H Iranmanesh
The International Journal of Advanced Manufacturing Technology 70, 1579-1589, 2014
372014
Risk evaluation of information technology projects based on fuzzy analytic hierarchal process
H Iranmanesh, SN Shirkouhi, MR Skandari
International Journal of Industrial and Manufacturing Engineering 2 (4), 191-195, 2008
372008
A self-partitioning local neuro fuzzy model for short-term load forecasting in smart grids
Z Tavassoli-Hojati, SF Ghaderi, H Iranmanesh, P Hilber, E Shayesteh
Energy 199, 117514, 2020
312020
A model for project scheduling with fuzzy precedence links
M Sharafi, F Jolai, H Iranmanesh, SM Hatefi
Australian Journal of Basic and Applied Sciences 2 (4), 1356-1361, 2008
292008
Developing a new structure for determining time risk priority using risk breakdown matrix in EPC projects
H Iranmanesh, M Jalili, Z Pirmoradi
2007 IEEE International Conference on Industrial Engineering and Engineering …, 2007
272007
A new formula to" Estimate At Completion" of a Project's time to improve" Earned Value Management System"
H Iranmanesh, N Mojir, S Kimiagari
2007 IEEE International Conference on Industrial Engineering and Engineering …, 2007
252007
Application of association rule mining in supplier selection criteria
A Haery, N Salmasi, MM Yazdi, H Iranmanesh
International Journal of Industrial and Manufacturing Engineering 2 (4), 483-487, 2008
192008
Financial management of Public Private Partnership projects using artificial intelligence and fuzzy model
A Sharafi, H Iranmanesh, MS Amalnick, M Abdollahzade
International journal of energy and statistics 4 (02), 1650007, 2016
172016
A self-similar local neuro-fuzzy model for short-term demand forecasting
H Hassani, M Abdollahzadeh, H Iranmanesh, A Miranian
Journal of Systems Science and Complexity 27, 3-20, 2014
152014
A genetic algorithm for makespan minimization in a no-wait flow shop problem with two batching machines
F Jolai, H Kor, SM Hatefi, H Iranmanesh
2009 International Conference on Computer Engineering and Technology 2, 238-242, 2009
152009
A multi-objective genetic algorithm for optimization of cellular manufacturing system
H Kor, H Iranmanesh, H Haleh, SM Hatefi
2009 International Conference on Computer Engineering and Technology 1, 252-256, 2009
142009
An intelligent system framework for generating activity list of a project using WBS mind map and semantic network
H Iranmanesh, M Madadi
International Journal of Computer and Information Engineering 2 (4), 1020-1027, 2008
142008
Literature review on dynamic cellular manufacturing system
AN Houshyar, Z Leman, HP Moghadam, M Ariffin, N Ismail, H Iranmanesh
IOP conference series: materials science and engineering 58 (1), 012016, 2014
132014
A new hybrid evolutionary algorithm for solving multi objective cell formation problem
H Haleh, H Iranmanesh, H Kor
2009 International Conference on Computers & Industrial Engineering, 612-616, 2009
132009
Le système ne peut pas réaliser cette opération maintenant. Veuillez réessayer plus tard.
Articles 1–20