Reza Tavakkoli-Moghaddam
TitreCitée parAnnée
A new multi-objective stochastic model for a forward/reverse logistic network design with responsiveness and quality level
M Ramezani, M Bashiri, R Tavakkoli-Moghaddam
Applied Mathematical Modelling 37 (1-2), 328-344, 2013
2802013
Reliability optimization of series-parallel systems with a choice of redundancy strategies using a genetic algorithm
R Tavakkoli-Moghaddam, J Safari, F Sassani
Reliability Engineering & System Safety 93 (4), 550-556, 2008
2222008
A hybrid multi-objective immune algorithm for a flow shop scheduling problem with bi-objectives: weighted mean completion time and weighted mean tardiness
R Tavakkoli-Moghaddam, A Rahimi-Vahed, AH Mirzaei
Information Sciences 177 (22), 5072-5090, 2007
1712007
Solving a dynamic cell formation problem using metaheuristics
R Tavakkoli-Moghaddam, MB Aryanezhad, N Safaei, A Azaron
Applied Mathematics and Computation 170 (2), 761-780, 2005
1532005
Group decision making based on novel fuzzy modified TOPSIS method
B Vahdani, SM Mousavi, R Tavakkoli-Moghaddam
Applied Mathematical Modelling 35 (9), 4257-4269, 2011
1492011
An efficient algorithm for solving a new mathematical model for a quay crane scheduling problem in container ports
R Tavakkoli-Moghaddam, A Makui, S Salahi, M Bazzazi, F Taheri
Computers & Industrial Engineering 56 (1), 241-248, 2009
1462009
Design of a facility layout problem in cellular manufacturing systems with stochastic demands
R Tavakkoli-Moghaddam, N Javadian, B Javadi, N Safaei
Applied Mathematics and Computation 184 (2), 721-728, 2007
1452007
Solving a group layout design model of a dynamic cellular manufacturing system with alternative process routings, lot splitting and flexible reconfiguration by simulated annealing
R Kia, A Baboli, N Javadian, R Tavakkoli-Moghaddam, M Kazemi, ...
Computers & Operations Research 39 (11), 2642-2658, 2012
1412012
A novel two-phase group decision making approach for construction project selection in a fuzzy environment
S Ebrahimnejad, SM Mousavi, R Tavakkoli-Moghaddam, H Hashemi, ...
Applied Mathematical Modelling 36 (9), 4197-4217, 2012
1322012
Sustainable design of a closed-loop location-routing-inventory supply chain network under mixed uncertainty
M Zhalechian, R Tavakkoli-Moghaddam, B Zahiri, M Mohammadi
Transportation Research Part E: Logistics and Transportation Review 89, 182-214, 2016
1302016
A multi-objective scatter search for a mixed-model assembly line sequencing problem
AR Rahimi-Vahed, M Rabbani, R Tavakkoli-Moghaddam, SA Torabi, ...
Advanced Engineering Informatics 21 (1), 85-99, 2007
1302007
Integrated multi-period cell formation and subcontracting production planning in dynamic cellular manufacturing systems
N Safaei, R Tavakkoli-Moghaddam
International Journal of Production Economics 120 (2), 301-314, 2009
1292009
Reliable design of a forward/reverse logistics network under uncertainty: a robust-M/M/c queuing model
B Vahdani, R Tavakkoli-Moghaddam, M Modarres, A Baboli
Transportation Research Part E: Logistics and Transportation Review 48 (6 …, 2012
1262012
Electromagnetism-like mechanism and simulated annealing algorithms for flowshop scheduling problems minimizing the total weighted tardiness and makespan
B Naderi, R Tavakkoli-Moghaddam, M Khalili
Knowledge-Based Systems 23 (2), 77-85, 2010
1172010
A hybrid simulated annealing for capacitated vehicle routing problems with the independent route length
R Tavakkoli-Moghaddam, N Safaei, Y Gholipour
Applied Mathematics and Computation 176 (2), 445-454, 2006
1152006
A new design of the elimination and choice translating reality method for multi-criteria group decision-making in an intuitionistic fuzzy environment
B Vahdani, SM Mousavi, R Tavakkoli-Moghaddam, H Hashemi
Applied Mathematical Modelling 37 (4), 1781-1799, 2013
1082013
A hybrid simulated annealing algorithm for location and routing scheduling problems with cross-docking in the supply chain
SM Mousavi, R Tavakkoli-Moghaddam
Journal of Manufacturing Systems 32 (2), 335-347, 2013
1042013
Multi-criteria sequencing problem for a mixed-model assembly line in a JIT production system
R Tavakkoli-Moghaddam, AR Rahimi-Vahed
Applied Mathematics and Computation 181 (2), 1471-1481, 2006
1012006
Design of a genetic algorithm for bi-objective unrelated parallel machines scheduling with sequence-dependent setup times and precedence constraints
R Tavakkoli-Moghaddam, F Taheri, M Bazzazi, M Izadi, F Sassani
Computers & Operations Research 36 (12), 3224-3230, 2009
992009
A new capacitated vehicle routing problem with split service for minimizing fleet cost by simulated annealing
R Tavakkoli-Moghaddam, N Safaei, MMO Kah, M Rabbani
Journal of the Franklin Institute 344 (5), 406-425, 2007
972007
Le système ne peut pas réaliser cette opération maintenant. Veuillez réessayer plus tard.
Articles 1–20