The impact of forecasting model selection on the value of information sharing in a supply chain X Zhao, J Xie, J Leung European Journal of Operational Research 142 (2), 321-344, 2002 | 328 | 2002 |
Inventory lot-sizing with supplier selection C Basnet, JMY Leung Computers & Operations Research 32 (1), 1-14, 2005 | 280 | 2005 |
Optimizing timetable synchronization for rail mass transit RCW Wong, TWY Yuen, KW Fung, JMY Leung Transportation Science 42 (1), 57-69, 2008 | 271 | 2008 |
Configuring a manufacturing firm's supply network with multiple suppliers B Kim, JMY Leung, K Park, G Zhang, S Lee IIE transactions 34 (8), 663-677, 2002 | 141 | 2002 |
Facets and algorithms for capacitated lot sizing JMY Leung, TL Magnanti, R Vachani Mathematical programming 45 (1), 331-359, 1989 | 138 | 1989 |
A survey of dial-a-ride problems: Literature review and recent developments SC Ho, WY Szeto, YH Kuo, JMY Leung, M Petering, TWH Tou Transportation Research Part B: Methodological 111, 395-421, 2018 | 135 | 2018 |
Split-delivery routeing heuristics in livestock feed distribution PA Mullaseril, M Dror, J Leung Journal of the Operational Research Society 48 (2), 107-116, 1997 | 126 | 1997 |
Devising a cost effective schedule for a baseball league RA Russell, JMY Leung Operations Research 42 (4), 614-625, 1994 | 124 | 1994 |
Valid inequalities and facets of the capacitated plant location problem JMY Leung, TL Magnanti Mathematical Programming 44 (1), 271-291, 1989 | 123 | 1989 |
Routing in point-to-point delivery systems: formulations and solution heuristics JMY Leung, TL Magnanti, V Singhal Transportation science 24 (4), 245-260, 1990 | 110 | 1990 |
Min-up/min-down polytopes J Lee, J Leung, F Margot Discrete Optimization 1 (1), 77-85, 2004 | 98 | 2004 |
Optimal cyclic multi-hoist scheduling: A mixed integer programming approach JMY Leung, G Zhang, X Yang, R Mak, K Lam Operations Research 52 (6), 965-976, 2004 | 97 | 2004 |
A new graph-theoretic heuristic for facility layout J Leung Management Science 38 (4), 594-605, 1992 | 94 | 1992 |
On the two-level uncapacitated facility location problem K Aardal, M Labbé, J Leung, M Queyranne INFORMS Journal on Computing 8 (3), 289-301, 1996 | 93 | 1996 |
A tabu search heuristic for the heterogeneous vehicle routing problem on a multigraph DSW Lai, OC Demirag, JMY Leung Transportation Research Part E: Logistics and Transportation Review 86, 32-52, 2016 | 76 | 2016 |
Optimal cyclic scheduling for printed circuit board production lines with multiple hoists and general processing sequence J Leung, G Zhang IEEE transactions on robotics and automation 19 (3), 480-484, 2003 | 67 | 2003 |
More facets from fences for linear ordering and acyclic subgraph polytopes J Leung, J Lee Discrete Applied Mathematics 50 (2), 185-200, 1994 | 57 | 1994 |
A graph-theoretic heuristic for designing loop-layout manufacturing systems J Leung European Journal of Operational Research 57 (2), 243-252, 1992 | 54 | 1992 |
Solving a manpower scheduling problem for airline catering using metaheuristics SC Ho, JMY Leung European Journal of Operational Research 202 (3), 903-921, 2010 | 51 | 2010 |
Improving the efficiency of a hospital emergency department: a simulation study with indirectly imputed service-time distributions YH Kuo, O Rado, B Lupia, JMY Leung, CA Graham Flexible Services and Manufacturing Journal 28 (1-2), 120-147, 2016 | 48 | 2016 |