A parameter-tuned genetic algorithm for the resource investment problem with discounted cash flows and generalized precedence relations AA Najafi, STA Niaki, M Shahsavar Computers & Operations Research 36 (11), 2994-3001, 2009 | 91 | 2009 |
Multi-mode resource-constrained project scheduling problem with material ordering under bonus penalty policies N Zoraghi, A Shahsavar, B Abbasi, V Van Peteghem TOP 25 (1), 49-79, 2016 | 48 | 2016 |
Three self-adaptive multi-objective evolutionary algorithms for a triple-objective project scheduling problem A Shahsavar, AA Najafi, STA Niaki Computers & Industrial Engineering 87, 4-15, 2015 | 41 | 2015 |
A hybrid project scheduling and material ordering problem: Modeling and solution algorithms N Zoraghi, A Shahsavar, STA Niaki Applied Soft Computing 58, 700-713, 2017 | 35 | 2017 |
An efficient genetic algorithm to maximize net present value of project payments under inflation and bonus–penalty policy in resource investment problem M Shahsavar, STA Niaki, AA Najafi Advances in Engineering Software 41 (7-8), 1023-1030, 2010 | 31 | 2010 |
Statistical design of genetic algorithms for combinatorial optimization problems M Shahsavar, AA Najafi, STA Niaki Mathematical Problems in Engineering 2011, 2011 | 27 | 2011 |
Integration of resource investment problem with quantity discount problem in material ordering for minimizing resource costs of projects A Shahsavar, N Zoraghi, B Abbasi Operational Research 18 (2), 315-342, 2018 | 23 | 2018 |
On the relationship between lean scheduling and economic performance in shipbuilding: A proposed model and comparative evaluation A Shahsavar, JK Sadeghi, J Shockley, D Ojha International Journal of Production Economics 239, 108202, 2021 | 20 | 2021 |
Project resource investment problem under progress payment model AA Najafi, E Merrikhi, A Shahsavar Journal of Industrial and Systems Engineering 11 (3), 84-101, 2018 | 8 | 2018 |
Material ordering with discount policy integrated with a project scheduling problem A Shahsavar, B Abbasi, N Zoraghi 2015 IEEE International Conference on Industrial Engineering and Engineering …, 2015 | 7 | 2015 |
A General Mathematical Model for Mobile Facilities in Location-Allocation Problems DO Sadeghi J, Shahsavar A DSI 2020, 2020 | | 2020 |
An Optimized Lean Lens for One-Off Projects ‒ Production Management DO Shahsavar A, Sadeghi J DSI 2019, 2019 | | 2019 |
A Two-Part Self-Adaptive Technique in Genetic Algorithms for Project Scheduling Problems A Shahsavar, STA Niaki, AA Najafi The Journal of Modern Project Management 4 (2), 2016 | | 2016 |
Multi-mode RCPSP with Material Ordering under Bonus Penalty Policies VPV Shahsavar M, Zoraghi N, Abbasi B 26th European Conference on Operational Research, 2013 | | 2013 |