Filippo Focacci
Filippo Focacci
DecisionBrain
Adresse e-mail validée de decisionbrain.com
Titre
Citée par
Citée par
Année
Cost-based domain filtering
F Focacci, A Lodi, M Milano
International conference on principles and practice of constraint …, 1999
1941999
Global cut framework for removing symmetries
F Focacci, M Milano
International Conference on Principles and Practice of Constraint …, 2001
1882001
A hybrid exact algorithm for the TSPTW
F Focacci, A Lodi, M Milano
INFORMS Journal on Computing 14 (4), 403-417, 2002
1572002
Local search and constraint programming
F Focacci, F Laburthe, A Lodi
Handbook of metaheuristics, 369-403, 2003
1492003
Solving Scheduling Problems with Setup Times and Alternative Resources.
F Focacci, P Laborie, W Nuijten
AIPS, 92-101, 2000
1092000
Solving VRPTWs with constraint programming based column generation
LM Rousseau, M Gendreau, G Pesant, F Focacci
Annals of Operations Research 130 (1-4), 199-216, 2004
882004
Integrating constraint logic programming and operations research techniques for the crew rostering problem
A Caprara, F Focacci, E Lamma, P Mello, M Milano, P Toth, D Vigo
Software: Practice and Experience 28 (1), 49-76, 1998
741998
Solving TSP with time windows with constraints
F Focacci, M Milano, A Lodi
Proceedings of the 1999 international conference on Logic programming, 515-529, 1999
641999
Optimization-oriented global constraints
F Focacci, A Lodi, M Milano
Constraints 7 (3-4), 351-365, 2002
582002
Cutting planes in constraint programming: An hybrid approach
F Focacci, A Lodi, M Milano
International Conference on Principles and Practice of Constraint …, 2000
542000
Solving TSP through the integration of OR and CP techniques
F Focacci, A Lodi, M Milano, D Vigo
Electronic notes in discrete mathematics 1, 13-25, 1999
451999
Embedding relaxations in global constraints for solving TSP and TSPTW
F Focacci, A Lodi, M Milano
Annals of Mathematics and Artificial Intelligence 34 (4), 291-311, 2002
422002
Towards an industrial manufacturing scheduling problem and test bed
W Nuijten, T Bousonville, F Focacci, D Godard, C Le Pape
Proc. of the 9th International Workshop on Project Management and Scheduling …, 2004
302004
Integration of CP and OR methods for matching problems
F Focacci, A Lodi, M Milano
Proceedings CP-AI-OR 99, 1999
251999
Pruning sub-optimal search branches using local search
F Focacci, P Shaw
CPAIOR 2, 181-189, 2002
242002
Solving combinatorial optimization problems in constraint programming
F Focacci
PhD thesis, Università di Ferrara, 2001
212001
Mathematical programming techniques in constraint programming: A short overview
F Focacci, A Lodi, M Milano
Journal of Heuristics 8 (1), 7-17, 2002
202002
Connections and integrations of dynamic programming and constraint programming
F Focacci, M Milano
Proceedings of the international workshop on integration of AI and OR …, 2001
162001
MaScLib: Problem description and test bed design
W Nuijten, T Bousonville, F Focacci, D Godard, C Le Pape
Retrieved February 27, 2008, 2003
132003
A constraint propagation algorithm for scheduling with sequence dependent setup times
F Focacci, W Nuijten
Proceedings of the International Workshop on Integration of Artificial …, 2000
132000
Le système ne peut pas réaliser cette opération maintenant. Veuillez réessayer plus tard.
Articles 1–20