Pesquisa operacional M Arenales, VA Armentano, R Morabito, HH Yanasse
Campus/elsevier, 2007
769 2007 Genetic local search for multi-objective flowshop scheduling problems JEC Arroyo, VA Armentano
European journal of operational research 167 (3), 717-738, 2005
237 2005 Tabu search with path relinking for an integrated production–distribution problem VA Armentano, AL Shiguemoto, A Løkketangen
Computers & Operations Research 38 (8), 1199-1209, 2011
221 2011 Tabu search for total tardiness minimization in flowshop scheduling problems VA Armentano, DP Ronconi
Computers & operations research 26 (3), 219-235, 1999
179 1999 Tardiness minimization in a flexible job shop: A tabu search approach CR Scrich, VA Armentano, M Laguna
Journal of intelligent manufacturing 15, 103-115, 2004
148 2004 Scatter search for project scheduling with resource availability cost DS Yamashita, VA Armentano, M Laguna
European journal of operational research 169 (2), 623-637, 2006
136 2006 A Lagrangian-based heuristic for the capacitated lot-sizing problem in parallel machines FMB Toledo, VA Armentano
European Journal of Operational Research 175 (2), 1070-1083, 2006
125 2006 Adaptive granular local search heuristic for a dynamic vehicle routing problem RM Branchini, VA Armentano, A Løkketangen
Computers & Operations Research 36 (11), 2955-2968, 2009
123 2009 Tabu search for minimizing total tardiness in a job shop VA Armentano, CR Scrich
International journal of production economics 63 (2), 131-140, 2000
121 2000 Lower bounding schemes for flowshops with blocking in-process DP Ronconi, VA Armentano
Journal of the Operational Research Society 52 (11), 1289-1297, 2001
116 2001 Robust optimization models for project scheduling with resource availability cost DS Yamashita, VA Armentano, M Laguna
Journal of scheduling 10, 67-76, 2007
114 2007 The Pencil and Controllability–Observability for Generalized Linear Systems: a Geometric Approach VA Armentano
SIAM journal on control and optimization 24 (4), 616-638, 1986
104 1986 A heuristic for single machine scheduling with early and tardy costs R Mazzini, VA Armentano
European Journal of Operational Research 128 (1), 129-146, 2001
93 2001 A heuristic method for lot-sizing in multi-stage systems PM França, VA Armentano, RE Berretta, AR Clark
Computers & operations research 24 (9), 861-874, 1997
92 1997 Eigenvalue placement for generalized linear systems VA Armentano
Systems & control letters 4 (4), 199-202, 1984
87 1984 Tabu search for scheduling on identical parallel machines to minimize mean tardiness VA Armentano, DS Yamashita
Journal of intelligent manufacturing 11, 453-460, 2000
81 2000 An application of a multi-objective tabu search algorithm to a bicriteria flowshop problem VA Armentano, JE Claudio
Journal of Heuristics 10, 463-481, 2004
80 2004 A genetic algorithm for scheduling on a single machine with set-up times and due dates VA Armentano, R Mazzini
Production Planning & Control 11 (7), 713-720, 2000
76 2000 Minimizing total tardiness in parallel machine scheduling with setup times: An adaptive memory-based GRASP approach VA Armentano, MF de França Filho
European Journal of Operational Research 183 (1), 100-114, 2007
74 2007 A heuristic for a resource-capacitated multi-stage lot-sizing problem with lead times AR Clark, VA Armentano
Journal of the Operational research Society, 1208-1222, 1995
71 1995