Follow
Mourad Boudhar
Mourad Boudhar
Professor, USTHB University
Verified email at usthb.dz
Title
Cited by
Cited by
Year
Scheduling on a batch machine with job compatibilities
M Boudhar, G Finke
JORBEL-Belgian Journal of Operations Research, Statistics, and Computer …, 2000
592000
Branch-and-bound and PSO algorithms for no-wait job shop scheduling
A AitZai, B Benmedjdoub, M Boudhar
Journal of Intelligent Manufacturing 27, 679-688, 2016
542016
Scheduling jobs on identical machines with agreement graph
M Bendraouche, M Boudhar
Computers & operations research 39 (2), 382-390, 2012
332012
A branch and bound and parallel genetic algorithm for the job shop scheduling problem with blocking
A AitZai, B Benmedjdoub, M Boudhar
International Journal of Operational Research 14 (3), 343-365, 2012
322012
Scheduling a batch processing machine with bipartite compatibility graphs
M Boudhar
Mathematical Methods of Operations Research 57, 513-527, 2003
292003
Parallel branch-and-bound and parallel PSO algorithms for job shop scheduling problem with blocking
A AitZai, M Boudhar
International Journal of Operational Research 16 (1), 14-37, 2013
282013
Preemptive scheduling in the presence of transportation times
M Boudhar, A Haned
Computers & operations research 36 (8), 2387-2393, 2009
272009
Scheduling on parallel machines with preemption and transportation delays
A Haned, A Soukhal, M Boudhar, NH Tuong
Computers & Operations Research 39 (2), 374-381, 2012
262012
Open shop scheduling problems with conflict graphs
NEH Tellache, M Boudhar
Discrete Applied Mathematics 227, 103-120, 2017
252017
Scheduling identical jobs on uniform machines with a conflict graph
A Mallek, M Bendraouche, M Boudhar
Computers & Operations Research 111, 357-366, 2019
232019
Dynamic scheduling on a single batch processing machine with split compatibility graphs
M Boudhar
Journal of Mathematical Modelling and Algorithms 2 (1), 17-35, 2003
232003
Flow shop scheduling problem with conflict graphs
NEH Tellache, M Boudhar
Annals of Operations Research 261, 339-363, 2018
222018
Scheduling: Agreement graph vs resource constraints
M Bendraouche, M Boudhar, A Oulamara
European Journal of Operational Research 240 (2), 355-360, 2015
222015
Two‐stage hybrid flow shop with recirculation
M Boudhar, N Meziani
International Transactions in Operational Research 17 (2), 239-255, 2010
212010
Multiobjective approach for deteriorating jobs scheduling for a sustainable manufacturing system
M Tigane, M Dahane, M Boudhar
The International Journal of Advanced Manufacturing Technology 101, 1939-1957, 2019
202019
Chain-reentrant shop with an exact time lag: new results
K Amrouche, M Boudhar, M Bendraouche, F Yalaoui
International Journal of Production Research 55 (1), 285-295, 2017
192017
Two machines flow shop with reentrance and exact time lag
K Amrouche, M Boudhar
RAIRO-Operations Research-Recherche Opérationnelle 50 (2), 223-232, 2016
182016
Two-machine flow shop problem with unit-time operations and conflict graph
NEH Tellache, M Boudhar
International Journal of Production Research 55 (6), 1664-1679, 2017
172017
PSO and simulated annealing for the two-machine flowshop scheduling problem with coupled-operations
N Meziani, M Boudhar, A Oulamara
European Journal of Industrial Engineering 12 (1), 43-66, 2018
162018
Scheduling on a batch processing machine with split compatibility graphs
M Boudhar
Journal of Mathematical Modelling and Algorithms 4, 391-407, 2005
162005
The system can't perform the operation now. Try again later.
Articles 1–20