Suivre
Rachid Benmansour
Rachid Benmansour
INSEA
Adresse e-mail validée de insea.ac.ma
Titre
Citée par
Citée par
Année
Minimizing the weighted sum of maximum earliness and maximum tardiness costs on a single machine with periodic preventive maintenance
R Benmansour, H Allaoui, A Artiba, S Hanafi
Computers & Operations Research 47, 106-113, 2014
492014
Scheduling preventive railway maintenance activities with resource constraints
R Macedo, R Benmansour, A Artiba, N Mladenović, D Urošević
Electronic Notes in Discrete Mathematics 58, 215-222, 2017
292017
Nested general variable neighborhood search for the periodic maintenance problem
R Todosijević, R Benmansour, S Hanafi, N Mladenović, A Artiba
European Journal of Operational Research 252 (2), 385-396, 2016
292016
Simulation‐based approach to joint production and preventive maintenance scheduling on a failure‐prone machine
R Benmansour, H Allaoui, A Artiba, S Iassinovski, R Pellerin
Journal of Quality in Maintenance Engineering, 2011
252011
Stochastic single machine scheduling with random common due date
R Benmansour, H Allaoui, A Artiba
International Journal of Production Research 50 (13), 3560-3571, 2012
172012
On the joint optimization of the periodic preventive maintenance and the spare parts inventory problem
A Mjirda, R Benmansour, H Allaoui, G Goncalves
IFAC-PapersOnLine 49 (12), 881-885, 2016
132016
Ant colony optimisation combined with variable neighbourhood search for scheduling preventive railway maintenance activities
S Khalouli, R Benmansour, S Hanafi
International Journal of Intelligent Engineering Informatics 6 (1-2), 78-98, 2018
122018
An ant colony algorithm based on opportunities for scheduling the preventive railway maintenance
S Khalouli, R Benmansour, S Hanafi
2016 International Conference on Control, Decision and Information …, 2016
122016
Heuristics for the single machine weighted sum of completion times scheduling problem with periodic maintenance
H Krim, R Benmansour, D Duvivier, D Aït-Kadi, S Hanafi
Computational Optimization and Applications 75 (1), 291-320, 2020
112020
Modelling and solving the multi-quays berth allocation and crane assignment problem with availability constraints
I Krimi, R Todosijević, R Benmansour, M Ratli, AA El Cadi, A Aloullal
Journal of Global Optimization 78 (2), 349-373, 2020
102020
Balancing preventive and corrective maintenance of aircraft assets: A cyber-physical systems approach
M Andreacchio, A Bekrar, R Benmansour, D Trentesaux
2016 IEEE 14th International Conference on Industrial Informatics (INDIN …, 2016
102016
Daily scheduling and routing of home health care with multiple availability periods of patients
M Bazirha, A Kadrani, R Benmansour
International Conference on Variable Neighborhood Search, 178-193, 2019
92019
On the single-processor scheduling problem with time restrictions
R Benmansour, O Braun, A Artiba
2014 International Conference on Control, Decision and Information …, 2014
92014
An accelerated MIP model for the single machine scheduling with preventive maintenance
O Souissi, R Benmansour, A Artiba
IFAC-PapersOnLine 49 (12), 1945-1949, 2016
82016
Hardware resource utilization optimization in FPGA-based heterogeneous MPSoC architectures
B Dammak, M Baklouti, R Benmansour, S Niar, M Abid
Microprocessors and Microsystems 39 (8), 1108-1118, 2015
82015
On the complexity of robotic flow shop with transportation constraints
N Chikhi, M Abbas, A Bekrar, R Benmansour, S Hanafi
ROADEF-15ème congrès annuel de la Société française de recherche …, 2014
72014
Approximation of continuous distribution via the generalized Erlang distribution
SE Elmagrhraby, R Benmansour, A Artiba, H Allaoui
IFAC Proceedings Volumes 42 (4), 240-245, 2009
62009
A mixed integer linear programming approach for design space exploration in FPGA-based MPSoC
B Dammak, R Benmansour, S Niar, M Baklouti, M Abid
2014 24th International Conference on Field Programmable Logic and …, 2014
52014
Mathematical programming and heuristics for scheduling problems with early and tardy penalties
M Ratli, R Benmansour, R Macedo, S Hanafi, C Wilbaut
Metaheuristics for Production Scheduling, 183-223, 2013
52013
Variable neighborhood search
R Benmansour, A Sifaleras, N Mladenovic
Springer International Publishing, 2020
42020
Le système ne peut pas réaliser cette opération maintenant. Veuillez réessayer plus tard.
Articles 1–20