S.M.J. Mirzapour Al-e-hashem
S.M.J. Mirzapour Al-e-hashem
Assistant Professor, Amirkabir University of Technology
Adresse e-mail validée de esc-rennes.fr - Page d'accueil
TitreCitée parAnnée
A multi-objective robust stochastic programming model for disaster relief logistics under uncertainty
A Bozorgi-Amiri, MS Jabalameli, SMJM Al-e-Hashem
OR spectrum 35 (4), 905-933, 2013
2802013
A multi-objective robust optimization model for multi-product multi-site aggregate production planning in a supply chain under uncertainty
SMJ Mirzapour Al-E-Hashem, H Malekly, MB Aryanezhad
International Journal of Production Economics 134 (1), 28-42, 2011
2622011
A stochastic aggregate production planning model in a green supply chain: Considering flexible lead times, nonlinear purchase and shortage cost functions
SMJ Mirzapour Al-e-Hashem, A Baboli, Z Sazvar
European Journal of Operational Research 230 (1), 26-41, 2013
982013
Dynamic cell formation and the worker assignment problem: a new model
MB Aryanezhad, V Deljoo, SMJ Mirzapour Al-e-Hashem
The International Journal of Advanced Manufacturing Technology 41 (3-4), 329-342, 2009
942009
Using genetic algorithm to solve dynamic cell formation problem
V Deljoo, SMJ Mirzapour Al-e-hashem, F Deljoo, MB Aryanezhad
Applied Mathematical Modelling 34 (4), 1078-1092, 2010
722010
A bi-objective stochastic programming model for a centralized green supply chain with deteriorating products
Z Sazvar, SMJ Mirzapour Al-e-hashem, A Baboli, MR Akbari Jokar
International Journal of Production Economics, 2014
682014
Multi-product multi-period Inventory Routing Problem with a transshipment option: A green approach
SMJ Mirzapour Al-e-hashem, Y Rekik
International Journal of Production Economics 157 (November 2014), 80-88, 2014
572014
An efficient algorithm to solve a multi-objective robust aggregate production planning in an uncertain environment
SMJM Al-e, MB Aryanezhad, SJ Sadjadi
The International Journal of Advanced Manufacturing Technology 58 (5-8), 765-782, 2012
542012
Designing safe job rotation schedules based upon workers skills
MB Aryanezhad, AS Kheirkhah, V Deljoo, SMJ Mirzapour Al-e-hashem
Int J Adv Manuf Technol 41, 193-199, 2009
472009
Mirzapour Al-e-hashem SMJ, Baboli A, Akbari Jokar MR (2014) A bi-objective stochastic programming model for a centralized green supply chain with deteriorating products
Z Sazvar
International Journal of Production Economics 150 (1), 140-154, 2014
382014
A Multiobjective Stochastic Production-Distribution Planning Problem in an Uncertain Environment Considering Risk and Workers Productivity
MAH SMJ, A Baboli
Mathematical Problems in Engineering 2011, 2011
202011
Investigation on a novel sustainable model for waste management in megacities: A case study in tehran municipality
MA Edalatpour, SMJ Mirzapour Al-e-hashem, B Karimi, B Bahli
Sustainable cities and society 36, 286-301, 2018
16*2018
A novel mathematical model for a multi-period, multi-product optimal ordering problem considering expiry dates in a FEFO system
Z. Sazvar, S.M.J. Mirzapour Al-e-hashem, K. Govindan, B. Bahli
Transportation Research Part E: Logistics and Transportation Review 93 …, 2016
142016
A new approach to solve a mixed-model assembly line with a bypass subline sequencing problem.
S Mirzapour Al-e-hashem, M Aryanezhad, A Jabbarzadeh
International Journal of Advanced Manufacturing Technology 52, 2011
132011
Mirzapour Al-e-hashem SMJ
V Deljoo
Deljoo F. and Aryanezhad MB, 1078-1092, 2010
13*2010
A hybrid L-shaped method to solve a bi-objective stochastic transshipment-enabled inventory routing problem
SMJ Mirzapour Al-e-hashem, Y Rekik, EM Hoseinhajlou
International Journal of Production Economics, 2017
92017
Mixed model assembly line balancing problem under uncertainty
SMJ Mirzapour Al-e-hashem, MB Aryanezhad, H Malekly, SJ Sadjadi
2009 International Conference on Computers & Industrial Engineering, 233-238, 2009
82009
An efficient method to solve a mixed-model assembly line sequencing problem considering a sub-line
S Al-e-Hashem, MB Aryanezhad
World Applied Sciences Journal 6 (2), 168-181, 2009
82009
Inventory routing problem for hazardous and deteriorating items in the presence of accident risk with transshipment option
A Timajchi, SMJM Al-e-Hashem, Y Rekik
International Journal of Production Economics 209, 302-315, 2019
72019
Mirzapour Al-e-hashem SMJ,(2008). Dynamic cell formation and the worker assignment problem: a new model
MB Aryanezhad, V Deljoo
International Journal of Advanced Manufacturing Technology, DOI 10, 0
7
Le système ne peut pas réaliser cette opération maintenant. Veuillez réessayer plus tard.
Articles 1–20