Ali Gharbi
Title
Cited by
Cited by
Year
Production planning of a hybrid manufacturing–remanufacturing system under uncertainty within a closed-loop supply chain
JP Kenné, P Dejax, A Gharbi
International Journal of Production Economics 135 (1), 81-93, 2012
2552012
Production and preventive maintenance rates control for a manufacturing system: an experimental design approach
A Gharbi, JP Kenné
International journal of production economics 65 (3), 275-287, 2000
1482000
Maintenance scheduling and production control of multiple-machine manufacturing systems
A Gharbi, JP Kenné
Computers & industrial engineering 48 (4), 693-707, 2005
1072005
Age-dependent production planning and maintenance strategies in unreliable manufacturing systems with lost sale
JP Kenné, A Gharbi, M Beit
European Journal of Operational Research 178 (2), 408-420, 2007
1052007
Control of production and corrective maintenance rates in a multiple-machine, multiple-product manufacturing system
JP Kenné, EK Boukas, A Gharbi
Mathematical and computer modelling 38 (3-4), 351-365, 2003
932003
Simultaneous control of production, repair/replacement and preventive maintenance of deteriorating manufacturing systems
FID Nodem, JP Kenné, A Gharbi
International Journal of Production Economics 134 (1), 271-282, 2011
832011
Optimal scheduling of a two-stage hybrid flow shop
M Haouari, L Hidri, A Gharbi
Mathematical Methods of Operations Research 64 (1), 107-124, 2006
832006
Optimal safety stocks and preventive maintenance periods in unreliable manufacturing systems
A Gharbi, JP Kenné, M Beit
International Journal of Production Economics 107 (2), 422-434, 2007
812007
Minimizing makespan on parallel machines subject to release dates and delivery times
A Gharbi, M Haouari
Journal of scheduling 5 (4), 329-355, 2002
732002
Joint optimal production control/preventive maintenance policy for imperfect process manufacturing cell
K Dhouib, A Gharbi, MNB Aziza
International Journal of Production Economics 137 (1), 126-136, 2012
702012
Experimental design in production and maintenance control problem of a single machine, single product manufacturing system
JP Kenne, A Gharbi
International Journal of Production Research 37 (3), 621-637, 1999
691999
Optimal production control problem in stochastic multiple-product multiple-machine manufacturing systems
A Gharbi, JP Kenne
IIE transactions 35 (10), 941-952, 2003
682003
Stohastic optimal production control problem with corrective maintenance
JP Kenné, A Gharbi
Computers & industrial engineering 46 (4), 865-875, 2004
652004
A simulation optimization approach in production planning of failure prone manufacturing systems
JP Kenne, A Gharbi
Journal of intelligent manufacturing 12 (5-6), 421-431, 2001
652001
Joint optimal lot sizing and production control policy in an unreliable and imperfect manufacturing system
B Bouslah, A Gharbi, R Pellerin
International Journal of Production Economics 144 (1), 143-156, 2013
602013
Integrated embedding optimization applied to Salt Lake valley aquifers
A Gharbi, RC Peralta
Water Resources Research 30 (3), 817-832, 1994
601994
Production planning problem in manufacturing systems with general failure and repair time distributions
JP Kenné, A Gharbi
Production Planning & Control 11 (6), 581-588, 2000
562000
Integrated production, sampling quality control and maintenance of deteriorating production systems with AOQL constraint
B Bouslah, A Gharbi, R Pellerin
Omega 61, 110-126, 2016
542016
A comparative study of pull control mechanisms for unreliable homogenous transfer lines
P Lavoie, A Gharbi, JP Kenne
International Journal of Production Economics 124 (1), 241-251, 2010
542010
Optimal parallel machines scheduling with availability constraints
A Gharbi, M Haouari
Discrete Applied Mathematics 148 (1), 63-87, 2005
542005
The system can't perform the operation now. Try again later.
Articles 1–20