Suivre
Mageed Ghaleb
Titre
Citée par
Citée par
Année
Real-time production scheduling in the Industry-4.0 context: Addressing uncertainties in job arrivals and machine breakdowns
M Ghaleb, H Zolfagharinia, S Taghipour
Computers & Operations Research 123, 105031, 2020
1322020
Integrated production and maintenance scheduling for a single degrading machine with deterioration-based failures
M Ghaleb, S Taghipour, M Sharifi, H Zolfagharinia
Computers & Industrial Engineering 143, 106432, 2020
1032020
The airport gate assignment problem: a survey
A Bouras, MA Ghaleb, US Suryahatmaja, AM Salem
The scientific world journal 2014, 2014
832014
Real-time integrated production-scheduling and maintenance-planning in a flexible job shop with machine deterioration and condition-based maintenance
M Ghaleb, S Taghipour, H Zolfagharinia
Journal of Manufacturing Systems 61, 423-449, 2021
632021
Experimental investigation and multi-objective optimization of Nd: YAG laser micro-channeling process of zirconia dental ceramic
BMA Abdo, AM El-Tamimi, S Anwar, U Umer, AM Alahmari, MA Ghaleb
The International Journal of Advanced Manufacturing Technology 98, 2213-2230, 2018
532018
Tabu search and particle swarm optimization algorithms for two identical parallel machines scheduling problem with a single server
I Alharkan, M Saleh, MA Ghaleb, H Kaid, A Farhan, A Almarfadi
Journal of King Saud University-Engineering Sciences 32 (5), 330-338, 2020
462020
Modeling and simulation of Queuing Systems using arena software: A case study
MA Ghaleb, US Suryahatmaja, IM Alharkan
2015 International Conference on Industrial Engineering and Operations …, 2015
262015
Assessing the impact of maintenance practices on asset's sustainability
M Ghaleb, S Taghipour
Reliability Engineering & System Safety 228, 108810, 2022
172022
Interruption management in human multitasking environments
S Darmoul, A Ahmad, M Ghaleb, M Alkahtani
IFAC-PapersOnLine 48 (3), 1179-1185, 2015
142015
Milling of graphene reinforced Ti6Al4V nanocomposites: An artificial intelligence based industry 4.0 approach
M M. Nasr, S Anwar, A M. Al-Samhan, M Ghaleb, A Dabwan
Materials 13 (24), 5707, 2020
112020
Joint parallel-machine scheduling and maintenance planning optimisation with deterioration, unexpected breakdowns, and condition-based maintenance
M Sharifi, M Ghaleb, S Taghipour
International Journal of Systems Science: Operations & Logistics 10 (1), 2200888, 2023
102023
Reinforcement learning-based real-time scheduling under random machine breakdowns and other disturbances: A case study
M Ghaleb, HA Namoura, S Taghipour
2021 Annual Reliability and Maintainability Symposium (RAMS), 1-8, 2021
92021
Scheduling two identical parallel machines subjected to release times, delivery times and unavailability constraints
AM Al-Shayea, M Saleh, M Alatefi, M Ghaleb
Processes 8 (9), 1025, 2020
92020
Real-time optimization of maintenance and production scheduling for an industry 4.0-based manufacturing system
M Ghaleb, S Taghipour, H Zolfagharinia
2020 annual reliability and maintainability symposium (RAMS), 1-8, 2020
72020
Optimal replacement, retrofit, and management of a fleet of assets under regulations of an emissions trading system
A Rajabian, M Ghaleb, S Taghipour
The Engineering Economist 66 (3), 225-244, 2021
62021
Simulation-based optimization of a two-echelon continuous review inventory model with lot size-dependent lead time
I Alharkan, M Saleh, M Ghaleb, A Farhan, A Badwelan
Processes 8 (9), 1014, 2020
52020
Human Interruption Management in Workplace Environments: An Overview.
M Alkahtani, MH Abidi, A Ahmad, S Darmoul, S Samman, M Ghaleb
Engineering, Technology & Applied Science Research 10 (2), 2020
52020
Metaheuristics for two-stage no-wait flexible flow shop scheduling problem
MA Ghaleb, US Suryahatmaja, IM Alharkan
2015 International Conference on Industrial Engineering and Operations …, 2015
52015
A combined multitasking performance measure involving sequential and parallel task executions
A Ahmad, M Ghaleb, S Darmoul, M Alkahtani, S Samman
Cognition, Technology & Work 23, 131-142, 2021
42021
Metaheuristics for identical parallel machines scheduling to minimize mean tardiness
H Kaid, I Alharkan, A Ghaleb, MA Ghaleb
2015 international conference on industrial engineering and operations …, 2015
42015
Le système ne peut pas réaliser cette opération maintenant. Veuillez réessayer plus tard.
Articles 1–20