The accomplishment of the engineering design activities of IFMIF/EVEDA: the European–Japanese project towards a Li (d, xn) fusion relevant neutron source J Knaster, A Ibarra, J Abal, A Abou-Sena, F Arbeiter, F Arranz, JM Arroyo, ... Nuclear Fusion 55 (8), 086003, 2015 | 87 | 2015 |
The IFMIF-DONES fusion oriented neutron source: evolution of the design Nuclear Fusion 63, 14, 2021 | 52* | 2021 |
Design of a beam dump for the IFMIF-EVEDA accelerator B Brañas, D Iglesias, F Arranz, G Barrera, N Casal, M García, J Gómez, ... Fusion Engineering and Design 84 (2-6), 509-513, 2009 | 34 | 2009 |
Caracterización mecánica del material óseo. ER Rincón, FA Merino, AR Felip, RC Alonso Tecnología y desarrollo 2, 24, 2004 | 28 | 2004 |
The IFMIF-DONES project: design status and main achievements within the EUROfusion FP8 work programme D Bernardi, A Ibarra, F Arbeiter, F Arranz, M Cappelli, P Cara, ... Journal of Fusion Energy 41 (2), 24, 2022 | 27 | 2022 |
The IFMIF-EVEDA accelerator beam dump design D Iglesias, F Arranz, JM Arroyo, G Barrera, B Brañas, N Casal, M García, ... Journal of Nuclear Materials 417 (1-3), 1275-1279, 2011 | 27 | 2011 |
Validation of the linear IFMIF prototype accelerator (LIPAc) in Rokkasho K Kondo, T Akagi, F Arranz, N Bazin, L Bellan, B Bolzon, B Branas, ... Fusion Engineering and Design 153, 111503, 2020 | 26 | 2020 |
The LIPAc beam dump B Brañas, F Arranz, O Nomen, D Iglesias, F Ogando, M Parro, ... Fusion Engineering and Design 127, 127-138, 2018 | 24 | 2018 |
Preliminary design of the HEBT of IFMIF DONES O Nomen, D Sanchez-Herranz, C Oliver, I Podadera, R Varela, F Ogando, ... Fusion Engineering and Design 153, 111515, 2020 | 21 | 2020 |
Design and analysis of the IFMIF–EVEDA beam dump cooling system M Parro, N Casal, D Iglesias, F Arranz, B Branas Fusion Engineering and Design 87 (4), 332-335, 2012 | 17 | 2012 |
Detailed mechanical design of the LIPAc beam dump radiological shielding O Nomen, JI Martínez, F Arranz, D Iglesias, G Barrera, B Brañas, ... Fusion Engineering and Design 88 (9-10), 2723-2727, 2013 | 14 | 2013 |
Lead shutter for the IFMIF LIPAc accelerator O Nomen, B Brañas, F Ogando, F Arranz, P Sauvan, J Castellanos Nuclear Instruments and Methods in Physics Research Section A: Accelerators …, 2018 | 12 | 2018 |
Evaluation of the electroforming technique for IFMIF-EVEDA beam dump manufacturing F Arranz, B Brañas, M Busch, M González, A Muñoz, B Szcepaniak, ... Fusion Science and Technology 60 (2), 538-543, 2011 | 11 | 2011 |
Remote disconnection system for the beam dump of the LIPAc accelerator F Arranz, O Nomen, B Brañas, J Castellanos, J Molla, D Gutierrez Fusion Engineering and Design 125, 123-126, 2017 | 9 | 2017 |
Design of the HEBT components inside TIR room of the IFMIF DONES facility D Sánchez-Herranz, O Nomen, F Arranz, S Coloma, I Podadera, R Varela Fusion Engineering and Design 168, 112636, 2021 | 8 | 2021 |
Manufacturing prototypes for LIPAC beam dump F Arranz, B Brañas, D Iglesias, O Nomen, D Rapisarda, J Lapeña, ... Fusion Engineering and Design 89 (9-10), 2199-2203, 2014 | 8 | 2014 |
IFMIF-EVEDA accelerator: Beam dump design B Brañas, D Iglesias, F Arranz, J Gómez, C Oliver, G Barrera, A Ibarra Proceeding EPAC, 2008 | 8 | 2008 |
Logistics and maintenance research activities for DONES facility F Arranz, T Lehmann, F Rauscher, G Fischer, S Koehler, J Garrido, ... Fusion Engineering and Design 192, 113630, 2023 | 7 | 2023 |
Design, manufacturing and tests of the LIPAc high energy beam transport line B Brañas, J Castellanos, O Nomen, C Oliver, F Aragón, F Arranz, ... Nuclear Fusion 61 (1), 015001, 2020 | 7 | 2020 |
Remote handling in the accelerator systems of DONES F Arranz, G Micciche, S Coloma, D Sánchez-Herranz, O Nomen, M Ferre, ... IEEE Transactions on Plasma Science 48 (6), 1743-1747, 2020 | 7 | 2020 |