Suivre
Nelson Morales
Nelson Morales
Advanced Mining Technology Center & Department of Mining Engineering, University of Chile
Adresse e-mail validée de amtc.uchile.cl
Titre
Citée par
Citée par
Année
Hardness and approximation of gathering in static radio networks
JC Bermond, J Galtier, R Klasing, N Morales, S Perennes
Parallel Processing Letters 16 (02), 165-183, 2006
802006
Aggregation heuristic for the open-pit block scheduling problem
E Jélvez, N Morales, P Nancel-Penard, J Peypouquet, P Reyes
European Journal of Operational Research 249 (3), 1169-1177, 2016
712016
On the complexity of bandwidth allocation in radio networks
R Klasing, N Morales, S Pérennes
Theoretical Computer Science 406 (3), 225-239, 2008
452008
Incorporation of geometallurgical attributes and geological uncertainty into long-term open-pit mine planning
N Morales, S Seguel, A Cáceres, E Jélvez, M Alarcón
Minerals 9 (2), 108, 2019
332019
Panel caving scheduling under precedence constraints considering mining system
M Smoljanovic, E Rubio, N Morales
35th APCOM Symposium, Wollongong, NSW, Australia, 407-417, 2011
272011
A new hybrid heuristic algorithm for the Precedence Constrained Production Scheduling Problem: A mining application
E Jélvez, N Morales, P Nancel-Penard, F Cornillier
Omega 94, 102046, 2020
192020
Stochastic open-pit mine production scheduling: A case study of an iron deposit
M Maleki, E Jélvez, X Emery, N Morales
Minerals 10 (7), 585, 2020
172020
A simulation–optimization framework for short-term underground mine production scheduling
F Manríquez, J Pérez, N Morales
Optimization and Engineering 21 (3), 939-971, 2020
142020
Gathering in specific radio networks
JC Bermond, J Galtier, R Klasing, N Morales, S Pérennes
Huitiemes Rencontres Francophones sur les Aspects Algorithmiques des …, 2006
142006
Open pit mine planning considering geomechanical fundamentals
A Parra, N Morales, J Vallejos, PMV Nguyen
International Journal of Mining, Reclamation and Environment 32 (4), 221-238, 2018
132018
Increasing the value and feasibility of open pit plans by integrating the mining system into the planning process
N Morales, P Reyes
Journal of the Southern African Institute of Mining and Metallurgy 116 (7 …, 2016
132016
A new model for automated pushback selection
E Jélvez, N Morales, H Askari-Nasab
Computers & Operations Research 115, 104456, 2020
122020
A two-stage stochastic model for open pit mine planning under geological uncertainty
E Moreno, X Emery, M Goycoolea, N Morales, G Nelis
Proceedings of the 38th International Symposium on the Application of …, 2017
122017
Optimizing open-pit block scheduling with exposed ore reserve
J Saavedra-Rosas, E Jeivez, J Amaya, N Morales
Journal of the Southern African Institute of Mining and Metallurgy 116 (7 …, 2016
122016
A comparison of conventional and direct block scheduling methods for open pit mine production scheduling
N Morales, E Jélvez, P Nancel-Penard, A Marinho, O Guimarães
Application of Computers and Operations Research in the Mineral Industry …, 2015
122015
Eight-dimensional planning: construction of an integrated model for the mine planning involving constructability
W Rocher, E Rubio, N Morales
Proceedings 35th International Symposium on Application of Computers in the …, 2011
112011
Application of optimized models through direct block scheduling in traditional mine planning
PHA Campos, CE Arroyo, N Morales
Journal of the Southern African Institute of Mining and Metallurgy 118 (4 …, 2018
102018
Footprint and economic envelope calculation for block/panel caving mines under geological uncertainty
E Vargas, N Morales, X Emery
Proceedings of the 3rd International Symposium on Block and Sublevel Caving …, 2014
102014
Comparison of different approaches to strategic open-pit mine planning under geological uncertainty
G Nelis, N Morales, E Widzyk-Capehart
Proceedings of the 27th International Symposium on Mine Planning and …, 2019
92019
Value-optimal design of ramps in open pit mining
P Nancel-Penard, A Parra, N Morales, C Díaz, E Widzyk-Capehart
Archives of Mining Sciences 64 (2), 2019
82019
Le système ne peut pas réaliser cette opération maintenant. Veuillez réessayer plus tard.
Articles 1–20