Early contractor involvement in design and its impact on construction schedule performance L Song, Y Mohamed, SM AbouRizk Journal of management in engineering 25 (1), 12-20, 2009 | 300 | 2009 |
Measuring and modeling labor productivity using historical data L Song, SM AbouRizk Journal of construction engineering and management 134 (10), 786-794, 2008 | 210 | 2008 |
Adaptive real-time tracking and simulation of heavy construction operations for look-ahead scheduling L Song, NN Eldin Automation in Construction 27, 32-39, 2012 | 145 | 2012 |
Lean construction implementation and its implication on sustainability: a contractor’s case study L Song, D Liang Canadian Journal of Civil Engineering 38 (3), 350-359, 2011 | 91 | 2011 |
Geographic information system-based visual simulation methodology and its application in concrete dam construction processes D Zhong, J Li, H Zhu, L Song Journal of Construction Engineering and Management 130 (5), 742-750, 2004 | 89 | 2004 |
Enhanced NURBS modeling and visualization for large 3D geoengineering applications: an example from the Jinping first-level hydropower engineering project, China DH Zhong, MC Li, LG Song, G Wang Computers & Geosciences 32 (9), 1270-1282, 2006 | 87 | 2006 |
Compaction quality control of earth-rock dam construction using real-time field operation data D Liu, J Sun, D Zhong, L Song Journal of construction engineering and management 138 (9), 1085-1094, 2012 | 75 | 2012 |
An optimized combination prediction model for concrete dam deformation considering quantitative evaluation and hysteresis correction Q Ren, M Li, L Song, H Liu Advanced Engineering Informatics 46, 101154, 2020 | 59 | 2020 |
An eco-environmental water demand based model for optimising water resources using hybrid genetic simulated annealing algorithms. Part I. Model development X Wang, Y Sun, L Song, C Mei Journal of environmental management 90 (8), 2628-2635, 2009 | 58 | 2009 |
Quantifying engineering project scope for productivity modeling L Song, SM AbouRizk Journal of construction engineering and management 131 (3), 360-367, 2005 | 48 | 2005 |
Virtual shop model for experimental planning of steel fabrication projects L Song, SM AbouRizk Journal of computing in civil engineering 20 (5), 308-316, 2006 | 40 | 2006 |
A robust prediction model for displacement of concrete dams subjected to irregular water‐level fluctuations Q Ren, M Li, H Li, L Song, W Si, H Liu Computer‐Aided Civil and Infrastructure Engineering 36 (5), 577-601, 2021 | 39 | 2021 |
Three-dimensional simulation on the water flow field and suspended solids concentration in the rectangular sedimentation tank X Wang, L Yang, Y Sun, L Song, M Zhang, Y Cao Journal of Environmental Engineering 134 (11), 902-911, 2008 | 37 | 2008 |
DRLSTM: A dual-stage deep learning approach driven by raw monitoring data for dam displacement prediction M Li, M Li, Q Ren, H Li, L Song Advanced Engineering Informatics 51, 101510, 2022 | 33 | 2022 |
A framework for real-time simulation of heavy construction operations L Song, F Ramos, K Arnold 2008 Winter Simulation Conference, 2387-2395, 2008 | 33 | 2008 |
Earned Value Management: a global and cross-industry perspective on current EVM practice L Song Project Management Institute, 2010 | 30 | 2010 |
A virtual shop modeling system for industrial fabrication shops L Song, P Wang, S AbouRizk Simulation Modelling Practice and Theory 14 (5), 649-662, 2006 | 30 | 2006 |
Real-time simulation for look-ahead scheduling of heavy construction projects L Song, C Cooper, SH Lee Construction Research Congress 2009: Building a Sustainable Future, 1318-1327, 2009 | 16 | 2009 |
Modeling uncertainty with an integrated simulation system L Song, HT Al-Battaineh, SM AbouRizk Canadian Journal of Civil Engineering 32 (3), 533-542, 2005 | 16 | 2005 |
An integrated method for evaluating and predicting long-term operation safety of concrete dams considering lag effect M Li, W Si, Q Ren, L Song, H Liu Engineering with Computers 37, 2505-2519, 2021 | 15 | 2021 |