Follow
Krimi Issam
Krimi Issam
Abu Dhabi University
Verified email at uir.ac.ma
Title
Cited by
Cited by
Year
Modelling and solving the multi-quays berth allocation and crane assignment problem with availability constraints
I Krimi, R Todosijević, R Benmansour, M Ratli, AA El Cadi, A Aloullal
Journal of Global Optimization 78 (2), 349-373, 2020
172020
A rolling horizon approach for the integrated multi-quays berth allocation and crane assignment problem for bulk ports
I Krimi, R Benmansour, A Cadi, L Deshayes, D Duvivier, N Elhachemi
International Journal of Industrial Engineering Computations 10 (4), 577-591, 2019
82019
Two-machine flowshop with synchronized periodic maintenance
I Krimi, R Benmansour, S Hanafi, N Elhachemi
RAIRO-Operations Research, 2018
72018
Availability analysis of a two-component parallel system under stochastic dependence
Z Bahou, N Elhachemi, I Krimi, AA El Cadi, N Sbihi
4th European International Conference on Industrial Engineering andá…, 2021
12021
The integrated multi-quay Berth Allocation and Crane Assignment Problem: Formulation and case study
I Krimi, R Benmansour, AA el Cadi, D Duvivier, N Elhachemi, L Deshayes, ...
2018 7th International Conference on Industrial Technology and Managementá…, 2018
12018
Model-Based operational analysis for complex systems: A case study for an integrated control system in a mining industry
H Lafquih, L Deshayes, ES Lissane, I Krimi
La revue scientifique internationale: Management et ingenierie des systemsá…, 2018
12018
A no-delay single machine scheduling problem to minimize total weighted early and late work
I Krimi, R Benmansour, R Todosijević, N Mladenovic, M Ratli
Optimization Letters, 1-19, 2022
2022
Modeling and analysis of a quality traceability framework for phosphate extraction process: evidence from Morocco
H Lafquih, SL Elhaq, I Krimi, M Berquedich
International Journal of Quality & Reliability Management, 2021
2021
A Variable Neighborhood Descent Heuristic for the Multi-quay Berth Allocation and Crane Assignment Problem Under Availability Constraints
I Krimi, A Aloullal, R Benmansour, A Ait El Cadi, L Deshayes, D Duvivier
International Conference on Variable Neighborhood Search, 232-242, 2018
2018
Lagrangian relaxation-based lower bound for the two-machine flow shop with synchronized periodic maintenance
I Krimi, R Benmansour, N Elhachemi, D Duvivier
2018 4th International Conference on Optimization and Applications (ICOA), 1-6, 2018
2018
Reactive scheduling for bulk port operations
I Krimi, R Benmansour, AA El Cadi, D Duvivier, N Elhachemi
Supply Chain Workshop-S&OP, 2018
2018
Optimisation conjointe de la production et de la maintenance
I Krimi, R Benmansour, N Elhachemi
Doctoriales des Hauts-De-France 2017, 2017
2017
Minimizing makespan in a two machine flow-shop problem under preventive maintenance activities
I Krimi, R Benmansour, S Hanafi, N Elhachemi
The 6th International Conference on Metaheuristics and Nature Inspiredá…, 2016
2016
Assessing the stochastic dependence effect on the integrated preventive maintenance scheduling and production planning
Z BAHOU, I KRIMI, N ELHACHEMI, AA El Cadi
The system can't perform the operation now. Try again later.
Articles 1–14