Follow
Krimi Issam
Title
Cited by
Cited by
Year
Modelling and solving the multi-quays berth allocation and crane assignment problem with availability constraints
I Krimi, R Todosijević, R Benmansour, M Ratli, AA El Cadi, A Aloullal
Journal of Global Optimization 78, 349-373, 2020
282020
A rolling horizon approach for the integrated multi-quays berth allocation and crane assignment problem for bulk ports
I Krimi, R Benmansour, AA El Cadi, L Deshayes, D Duvivier, N Elhachemi
International Journal of Industrial Engineering Computations 10 (4), 577-591, 2019
172019
Two-machine flowshop with synchronized periodic maintenance
I Krimi, R Benmansour, S Hanafi, N Elhachemi
RAIRO-Operations Research, 2018
82018
Availability modelling and analysis of a two-component parallel system under stochastic dependence
Z Bahou, I Krimi, AAE Cadi, NE Hachemi
International Journal of Mathematics in Operational Research 26 (3), 327-356, 2023
22023
Modeling and analysis of a quality traceability framework for phosphate extraction process: evidence from Morocco
H Lafquih, S Lissane Elhaq, I Krimi, M Berquedich
International Journal of Quality & Reliability Management 39 (6), 1412-1428, 2022
22022
The integrated multi-quay Berth Allocation and Crane Assignment Problem: Formulation and case study
I Krimi, R Benmansour, AA el Cadi, D Duvivier, N Elhachemi, L Deshayes, ...
2018 7th International Conference on Industrial Technology and Management …, 2018
22018
A dynamic availability analysis of an N-component production system with interdependency effects: a fractional-order approach
Z Bahou, MR Lemnaouar, I Krimi
Production Engineering 18 (1), 99-115, 2024
12024
A no-delay single machine scheduling problem to minimize total weighted early and late work
I Krimi, R Benmansour, R Todosijević, N Mladenovic, M Ratli
Optimization Letters 17 (9), 2113-2131, 2023
12023
Assessing the stochastic dependence effect on the integrated preventive maintenance scheduling and production planning
Z BAHOU, I KRIMI, N ELHACHEMI, AA El Cadi
12022
Availability analysis of a two-component parallel system under stochastic dependence
Z Bahou, N Elhachemi, I Krimi, AA El Cadi, N Sbihi
4th European International Conference on Industrial Engineering and …, 2021
12021
A variable neighborhood descent heuristic for the multi-quay berth allocation and crane assignment problem under availability constraints
I Krimi, A Aloullal, R Benmansour, A Ait El Cadi, L Deshayes, D Duvivier
Variable Neighborhood Search: 6th International Conference, ICVNS 2018 …, 2019
12019
Model-Based operational analysis for complex systems: A case study for an integrated control system in a mining industry
H Lafquih, L Deshayes, ES Lissane, I Krimi
La revue scientifique internationale: Management et ingenierie des systems …, 2018
12018
Self-adaptive General Variable Neighborhood Search algorithm for parallel machine scheduling with unrelated servers
I Krimi, R Benmansour
Computers & Operations Research 163, 106480, 2024
2024
Integrated non-cyclical preventive maintenance scheduling and production planning for multi-parallel component production systems with interdependencies-induced degradation
Z Bahou, MR Lemnaouar, I Krimi
The International Journal of Advanced Manufacturing Technology, 1-27, 2024
2024
Correction to: A no-delay single machine scheduling problem to minimize total weighted early and late work
I Krimi, R Benmansour, R Todosijević, N Mladenovic, M Ratli
Optimization Letters 17 (9), 2133-2134, 2023
2023
Sustainable and Resilient Capacity Expansion Planning for Chemical Processing Industry: A Bi-Objective Approach
I Krimi, R Al-Aomar
Journal of Industrial Integration and Management, 1-23, 2023
2023
Digging into Mining 4.0: Applying Systems Engineering to a Digital Spare Parts Management System
H Lafquih, I Krimi, SL Elhaq
IEEE Engineering Management Review, 2023
2023
Mathematical models and algorithms for bulk port-related supply chain optimization
I Krimi
Université de Valenciennes et du Hainaut-Cambrésis; Ecole Mohammadia d …, 2019
2019
Lagrangian relaxation-based lower bound for the two-machine flow shop with synchronized periodic maintenance
I Krimi, R Benmansour, N Elhachemi, D Duvivier
2018 4th International Conference on Optimization and Applications (ICOA), 1-6, 2018
2018
Reactive scheduling for bulk port operations
I Krimi, R Benmansour, AA El Cadi, D Duvivier, N Elhachemi
Supply Chain Workshop-S&OP, 2018
2018
The system can't perform the operation now. Try again later.
Articles 1–20