Oussama Ben-Ammar
Title
Cited by
Cited by
Year
A state of the art on supply planning and inventory control under lead time uncertainty
A Dolgui, O Ben-Ammar, F Hnaien, MA Louly
Studies in Informatics and Control 22 (3), 255-268, 2013
662013
Mathematical model for supply planning of multi-level assembly systems with stochastic lead times
O Ben-Ammar, H Marian, D Wu, A Dolgui
IFAC Proceedings Volumes 46 (9), 389-394, 2013
142013
Planned lead times optimization for multi-level assembly systems under uncertainties
O Ben-Ammar, A Dolgui, DD Wu
Omega 78, 39-56, 2018
122018
Supply planning and inventory control under lead time uncertainty: A review
O Ben-Ammar, A Dolgui, F Hnaien, MA Louly
IFAC Proceedings Volumes 46 (9), 359-370, 2013
122013
CONFIGURATION D'UN SYSTÈME D'ASSEMBLAGE MULTI-NIVEAUX SOUS INCERTITUDES DES DÉLAIS D'APPROVISIONNEMENT
O Ben-Ammar, H Marian, A Dolgui
9th International Conference on Modeling, Optimization & SIMulation, 10p, 2012
102012
Optimal order release dates for two-level assembly systems with stochastic lead times at each level
O Ben-Ammar, A Dolgui
International Journal of Production Research 56 (12), 4226-4242, 2018
82018
Optimization for supply planning in multi-level assembly systems with stochastic lead-times
O Ben-Ammar, H Marian, A Dolgui
Industrial Engineering and Systems Management (IESM), Proceedings of 2013 …, 2013
62013
Optimization approaches for multi-level assembly systems under stochastic lead times
O Ben-Ammar, F Hnaien, H Marian, A Dolgui
Metaheuristics for Production Systems, 93-107, 2016
52016
Reducing the research space of possible order release dates for multi-level assembly systems under stochastic lead times
O Ben-Ammar, H Marian, A Dolgui, D Wu
IFIP International Conference on Advances in Production Management Systems …, 2014
52014
Integrated production planning and quality control for linear production systems under uncertainties of cycle time and finished product quality
O Ben-Ammar, B Bettayeb, A Dolgui
International Journal of Production Research 58 (4), 1144-1160, 2020
32020
Optimization of multi-period supply planning under stochastic lead times and a dynamic demand
O Ben-Ammar, B Bettayeb, A Dolgui
International Journal of Production Economics 218, 106-117, 2019
32019
Supply planning optimization for linear production system with stochastic lead-times and quality control
O Ben-Ammar, B Bettayeb, A Dolgui
International Conference on Industrial Engineering and Systems Management …, 2017
32017
MRP parameter evaluation under fuzzy lead times
O Ben-Ammar, R Guillaume, C Thierry
IFAC-PapersOnLine 49 (12), 1110-1115, 2016
32016
Genetic algorithm for multi-level assembly systems under stochastic lead times
O Ben-Ammar, A Dolgui, H Marian
IFAC Proceedings Volumes 47 (3), 778-783, 2014
32014
Planification des réapprovisionnements sous incertitudes pour les systèmes d’assemblage à plusieurs niveaux
O Ben-Ammar
Saint-Etienne, EMSE, 2014
32014
New mixed integer approach to solve a multi-level capacitated disassembly lot-sizing problem with defective items and backlogging
I Slama, O Ben-Ammar, A Dolgui, F Masmoudi
Journal of Manufacturing Systems 56, 50-57, 2020
22020
Disassembly scheduling problem: literature review and future research directions
I Slama, O Ben-Ammar, F Masmoudi, A Dolgui
IFAC MIM 2019, 2019
22019
Planification des réapprovisionnements pour système d'assemblage à deux niveaux quand les délais d'approvisionnement sont aléatoires
O Ben-Ammar, F Hnaien, H Marian, A Dolgui
Quatorzième congrès annuel de la Société Française de recherche …, 2013
22013
Analysis method of the relations between MRP parameter and performance indicator based on a literature review
D Damand, O Ben-Ammar, E Lepori, M Barth
IFAC Proceedings Volumes 46 (9), 377-382, 2013
22013
Scenario-based stochastic linear programming model for multi-period disassembly lot-sizing problems under random lead time
I Slama, O Ben-Ammar, F Masmoudi, A Dolgui
IFAC MIM 2019, 2019
12019
The system can't perform the operation now. Try again later.
Articles 1–20