Follow
Salvador Senent
Salvador Senent
Verified email at upm.es
Title
Cited by
Cited by
Year
Tunnel face stability in heavily fractured rock masses that follow the Hoek–Brown failure criterion
S Senent, G Mollon, R Jimenez
International Journal of Rock Mechanics and Mining Sciences 60, 440-451, 2013
1472013
A tunnel face failure mechanism for layered ground, considering the possibility of partial collapse
S Senent, R Jimenez
Tunnelling and Underground Space Technology 47, 182-192, 2015
1392015
Distinct element method simulations of rock-concrete interfaces under different boundary conditions
JG Gutiérrez-Ch, S Senent, S Melentijevic, R Jimenez
Engineering Geology 240, 123-139, 2018
992018
Reliability analysis of circular tunnel face stability obeying Hoek–Brown failure criterion considering different distribution types and correlation structures
P Zeng, S Senent, R Jimenez
Journal of Computing in Civil Engineering 30 (1), 04014126, 2016
672016
Reliability analysis of circular tunnel face stability obeying Hoek–Brown failure criterion considering different distribution types and correlation structures
P Zeng, S Senent, R Jimenez
Journal of Computing in Civil Engineering 30 (1), 04014126, 2016
672016
Structure from Motion photogrammetry to characterize underground rock masses: Experiences from two real tunnels
R García-Luna, S Senent, R Jurado-Piña, R Jimenez
Tunnelling and Underground Space Technology 83, 262-273, 2019
642019
Prediction of time-dependent tunnel convergences using a Bayesian updating approach
X Feng, R Jimenez, P Zeng, S Senent
Tunnelling and Underground Space Technology 94, 103118, 2019
342019
DEM simulation of rock creep in tunnels using Rate Process Theory
JG Gutiérrez-Ch, S Senent, P Zeng, R Jimenez
Computers and Geotechnics 142, 104559, 2022
332022
A DEM-based factor to design rock-socketed piles considering socket roughness
JG Gutiérrez-Ch, S Senent, S Melentijevic, R Jimenez
Rock Mechanics and Rock Engineering 54 (7), 3409-3421, 2021
232021
An upper bound solution for tunnel face stability analysis considering the free span
S Senent, C Yi, R Jimenez
Tunnelling and Underground Space Technology 103, 103515, 2020
232020
Effect of advance drainage on tunnel face stability using Limit Analysis and numerical simulations
C Yi, S Senent, R Jimenez
Tunnelling and Underground Space Technology 93, 103105, 2019
222019
Numerical simulation of the influence of small-scale defects on the true-triaxial strength of rock samples
S Senent, R Jimenez, A Reyes
Computers and Geotechnics 53, 142-156, 2013
202013
Distinct-element method simulations of rock-socketed piles: estimation of side shear resistance considering socket roughness
JG Gutiérrez-Ch, S Melentijevic, S Senent, R Jimenez
Journal of Geotechnical and Geoenvironmental Engineering 146 (12), 04020133, 2020
182020
Discrete element modelling of rock creep behaviour using rate process theory
JG Gutiérrez-Ch, S Senent, E Estebanez, R Jimenez
Canadian Geotechnical Journal 58 (8), 1231-1246, 2021
172021
Rock shear creep modelling: DEM–Rate process theory approach
JG Gutiérrez-Ch, S Senent, EP Graterol, P Zeng, R Jimenez
International Journal of Rock Mechanics and Mining Sciences 161, 105295, 2023
122023
Using telephoto lens to characterize rock surface roughness in SfM models
R García-Luna, S Senent, R Jimenez
Rock Mechanics and Rock Engineering 54 (5), 2369-2382, 2021
122021
New collocation method for stochastic response surface reliability analyses
P Zeng, T Li, Y Chen, R Jimenez, X Feng, S Senent
Engineering with Computers 36, 1751-1762, 2020
122020
Sliding stability analysis of gravity dam founded on rock mass with impersistent joint set
M Cabrera, S Senent, C Olalla, R Jimenez
Canadian Geotechnical Journal 52 (11), 1668-1684, 2015
122015
DEM models to predict side shear resistance of rock-socketed piles considering socket roughness
JG Gutiérrez-Ch, S Melentijevic, S Senent, R Jimenez
ARMA US Rock Mechanics/Geomechanics Symposium, ARMA-2019-1757, 2019
62019
La estabilidad del frente de excavación de un túnel en terrenos heterogéneos o con un criterio de rotura no-lineal
S Senent Domínguez
Caminos, 2015
42015
The system can't perform the operation now. Try again later.
Articles 1–20