Suivre
Mônica de Souza Zambelli
Mônica de Souza Zambelli
Pesquisador Colaborador da Universidade Estadual de Campinas
Adresse e-mail validée de cose.fee.unicamp.br
Titre
Citée par
Citée par
Année
Deterministic versus stochastic models for long term hydrothermal scheduling
M Zambelli, TG Siqueira, M Cicogna, S Soares
Power Engineering Society General Meeting, 2006. IEEE, 7 pp., 2006
672006
Long-term hydropower scheduling based on deterministic nonlinear optimization and annual inflow forecasting models
MS Zambelli, I Luna, S Soares
PowerTech, 2009 IEEE Bucharest, 1-8, 2009
482009
Stochastic dynamic programming for long term hydrothermal scheduling considering different streamflow models
TG Siqueira, M Zambelli, M Cicogna, M Andrade, S Soares
Probabilistic Methods Applied to Power Systems, 2006. PMAPS 2006 …, 2006
422006
NEWAVE versus ODIN: comparison of stochastic and deterministic models for the long term hydropower scheduling of the interconnected brazilian system
M Zambelli, S Soares Filho, AE Toscano, E Santos, D Silva Filho
Sba: Controle & Automação 22 (6), 598-609, 2011
342011
A predictive control approach for long term hydrothermal scheduling
MS Zambelli, S Soares
Power Systems Conference and Exposition, 2009. PSCE'09. IEEE/PES, 1-8, 2009
142009
Aggregated inflows on stochastic dynamic programming for long term hydropower scheduling
RO Scarcelli, MS Zambelli, AA Carneiro
North American Power Symposium (NAPS), 2014, 1-6, 2014
102014
Model predictive control applied to the long-term hydrothermal scheduling of the Brazilian power system
MS Zambelli, LSA Martins, S Soares
PowerTech (POWERTECH), 2013 IEEE Grenoble, 1-6, 2013
102013
Deterministic versus stochastic dynamic programming for long term hydropower scheduling
MS Zambelli, S Soares, D da Silva
PowerTech, 2011 IEEE Trondheim, 1-7, 2011
102011
Newave versus ODIN comparação entre modelo estocástico e determinístico no planejamento da operação energética do sistema interligado nacional
M Zambelli, A Toscano, S SOARES FILHO, E DOS SANTOS, ...
Congresso Brasileiro de Automática, CBA2010, 347-354, 2010
82010
Hydropower Scheduling in Large Scale Power Systems
M Zambelli, IL Huamani, S Soares, M Kadowaki, T Ohishi
Hydropower - Practice and Application 1, 201-226, 2012
52012
Long-term hydropower scheduling using model predictive control approach with hybrid monthly-annual inflow forecasting
MS Zambelli, MS Lopes, S Soares
Transmission and Distribution: Latin America Conference and Exposition (T&D …, 2012
32012
Predictive control approach for long-term hydropower scheduling using annual inflow forecasting model
MS Zambelli, I Luna, S Soares
6th IFAC Symposium on Power Plants and Power Systems Control, 1-6, 2009
32009
Odin: Metodologia para a otimizaçao do despacho interligado nacional
MS Zambelli, AE Toscano, ES Pereira, AT Azevedo, S Soares, D da Silva
VI Congresso de Inovaçao Tecnológica em Energia Elétrica-Citenel, ANEEL …, 2011
22011
Le système ne peut pas réaliser cette opération maintenant. Veuillez réessayer plus tard.
Articles 1–13