Hans Georg Beyer
Hans Georg Beyer
Professor, University of the Faroe Islands
Adresse e-mail validée de setur.fo
Titre
Citée par
Citée par
Année
Irradiance forecasting for the power prediction of grid-connected photovoltaic systems
E Lorenz, J Hurka, D Heinemann, HG Beyer
IEEE Journal of selected topics in applied earth observations and remote …, 2009
6372009
Solar energy assessment using remote sensing technologies
A Hammer, D Heinemann, C Hoyer, R Kuhlemann, E Lorenz, R Müller, ...
Remote Sensing of Environment 86 (3), 423-432, 2003
3892003
Short-term prediction of the aggregated power output of wind farms—a statistical analysis of the reduction of the prediction error by spatial smoothing effects
U Focken, M Lange, K Mönnich, HP Waldl, HG Beyer, A Luig
Journal of Wind Engineering and Industrial Aerodynamics 90 (3), 231-246, 2002
3362002
Modifications of the Heliosat procedure for irradiance estimates from satellite images
HG Beyer, C Costanzo, D Heinemann
Solar Energy 56 (3), 207-212, 1996
2911996
Monitoring and remote failure detection of grid-connected PV systems based on satellite observations
A Drews, AC De Keizer, HG Beyer, E Lorenz, J Betcke, W Van Sark, ...
Solar energy 81 (4), 548-564, 2007
2492007
Mapping the performance of PV modules, effects of module type and data averaging
T Huld, R Gottschalg, HG Beyer, M Topič
Solar Energy 84 (2), 324-338, 2010
2382010
The European solar radiation Atlas: fundamentals and maps
K Scharmer
Presses des MINES, 2000
225*2000
Power characteristics of PV ensembles: experiences from the combined power production of 100 grid connected PV systems distributed over the area of Germany
E Wiemken, HG Beyer, W Heydenreich, K Kiefer
Solar energy 70 (6), 513-518, 2001
1862001
Analysis of different comparison parameters applied to solar radiation data from satellite and German radiometric stations
B Espinar, L Ramírez, A Drews, HG Beyer, LF Zarzalejo, J Polo, L Martín
Solar Energy 83 (1), 118-125, 2009
1562009
A method for the identification of configurations of PV/wind hybrid systems for the reliable supply of small loads
HG Beyer, C Langer
Solar energy 57 (5), 381-391, 1996
1321996
Qualification of wind power forecasts
S Bofinger, A Luig, HG Beyer
2002 Global Windpower Conference, Paris 2 (5), 2002
1082002
Short term prediction of wind speed and power output of a wind turbine with neural networks
HG Beyer, T Degner, J Hausmann, M Hoffmann, P Rujan
Proceedings of the EWEC 94, 349-352, 1994
821994
Satellight: a WWW server which provides high quality daylight and solar radiation data for Western and Central Europe
M Fontoynont, D Dumortier, D Heinnemann, A Hammer, J Olseth, ...
781998
Identification of a General Model for the MPP Performance of PV-Modules for the Application in a Procedure for the Performance Check of Grid Connected Systems
HG Beyer, J Betcke, A Drews, D Heinemann, E Lorenz, G Heilscher, ...
19th European Photovoltaic Solar Energy Conference and Exhibition, Paris …, 2004
772004
Modelling long-term module performance based on realistic reporting conditions with consideration to spectral effects
SR Williams, TR Betts, T Helf, R Gottschalg, HG Beyer, DG Infield
3rd World Conference onPhotovoltaic Energy Conversion, 2003. Proceedings of …, 2003
752003
Analysis of confidence intervals for the prediction of regional wind power output
A Luig, S Bofinger, HG Beyer
Proceedings of the European wind energy conference, Copenhagen, Denmark, 725-728, 2001
682001
Forecast of ensemble power production by grid-connected PV systems
E Lorenz, D Heinemann, H Wickramarathne, HG Beyer, S Bofinger
20th European PV Conference, 3.9-7.9, 2007
622007
Assessment of the method used to construct clearness index maps for the new European solar radiation atlas (ESRA)
HG Beyer, G Czeplak, U Terzenbach, L Wald
Solar Energy 61 (6), 389-397, 1997
611997
Forecast of regional power output of wind turbines
HG Beyer, D Heinemann, H Mellinghoff, K Monnich, HP Waldl
EWEC-CONFERENCE-, 1070-1073, 1999
581999
D 1.1. 3 “Report on Benchmarking of Radiation Products”
HG Beyer, J Polo Martinez, M Suri, JL Torres, E Lorenz, SC Müller, ...
Report under contract, 2009
562009
Le système ne peut pas réaliser cette opération maintenant. Veuillez réessayer plus tard.
Articles 1–20