Malgorzata Sterna
Malgorzata Sterna
Instytut Informatyki, Wydział Informatyki, Politechnika Poznańska
Adresse e-mail validée de cs.put.poznan.pl
Titre
Citée par
Citée par
Année
The disjunctive graph machine representation of the job shop scheduling problem
J Błażewicz, E Pesch, M Sterna
European Journal of Operational Research 127 (2), 317-331, 2000
882000
A survey of scheduling problems with late work criteria
M Sterna
Omega 39 (2), 120-129, 2011
732011
Open shop scheduling problems with late work criteria
J Błażewicz, E Pesch, M Sterna, F Werner
Discrete Applied Mathematics 134 (1-3), 1-24, 2004
702004
Metaheuristic approaches for the two-machine flow-shop problem with weighted late work criterion and common due date
J Blazewicz, E Pesch, M Sterna, F Werner
Computers & Operations Research 35 (2), 574-599, 2008
602008
The two-machine flow-shop problem with weighted late work criterion and common due date
J Błażewicz, E Pesch, M Sterna, F Werner
European Journal of Operational Research 165 (2), 408-415, 2005
542005
A comparison of solution procedures for two-machine flow shop scheduling with late work criterion
J Blazewicz, E Pesch, M Sterna, F Werner
Computers & Industrial Engineering 49 (4), 611-624, 2005
422005
Problems and algorithms in non-classical shop scheduling
M Sterna
Scientific Publishers OWN [Ośrodek Wydawnictw Naukowych], 2000
342000
Late work minimization in flow shops by a genetic algorithm
E Pesch, M Sterna
Computers & Industrial Engineering 57 (4), 1202-1209, 2009
332009
Late work minimization in a small flexible manufacturing system
M Sterna
Computers & Industrial Engineering 52 (2), 210-228, 2007
312007
A note on the two machine job shop with the weighted late work criterion
J Blazewicz, E Pesch, M Sterna, F Werner
Journal of Scheduling 10 (2), 87-95, 2007
302007
Total late work criteria for shop scheduling problems
J Blazewicz, E Pesch, M Sterna, F Werner
Operations Research Proceedings 1999, 354-359, 2000
292000
Total late work criteria for shop scheduling problems
J Błażewicz, E Pesch, M Sterna, F Werner
Operations research proceedings 1999, 354-359, 2000
292000
A novel representation of graph structures in web mining and data analysis
J Błażewicz, E Pesch, M Sterna
Omega 33 (1), 65-71, 2005
262005
Scheduling on parallel identical machines with late work criterion: Offline and online cases
X Chen, M Sterna, X Han, J Blazewicz
Journal of Scheduling 19 (6), 729-736, 2016
222016
Metaheuristics for late work minimization in two-machine flow shop with common due date
J Blazewicz, E Pesch, M Sterna, F Werner
Annual conference on artificial intelligence, 222-234, 2005
212005
Dominance relations for two-machine flow shop problem with late work criterion
M Sterna
Bulletin of the Polish Academy of Sciences: Technical Sciences, 59-69, 2007
202007
Flow shop scheduling with late work criterion–choosing the best solution strategy
J Blazewicz, E Pesch, M Sterna, F Werner
Asian Applied Computing Conference, 68-75, 2004
202004
Complexity of late work minimization in flow shop systems and a particle swarm optimization algorithm for learning effect
X Chen, V Chau, P Xie, M Sterna, J Błażewicz
Computers & Industrial Engineering 111, 176-182, 2017
172017
Late work scheduling in shop systems
M Sterna
Wydawnictwo Politechniki Poznańskiej, 2006
172006
Polynomial time approximation scheme for two parallel machines scheduling with a common due date to maximize early work
M Sterna, K Czerniachowska
Journal of Optimization Theory and Applications 174 (3), 927-944, 2017
142017
Le système ne peut pas réaliser cette opération maintenant. Veuillez réessayer plus tard.
Articles 1–20