Suivre
Hooman Askari-Nasab
Hooman Askari-Nasab
Professor of Mining Engineering, University of Alberta
Adresse e-mail validée de ualberta.ca - Page d'accueil
Titre
Citée par
Citée par
Année
Mining fleet management systems: a review of models and algorithms
A Moradi Afrapoli, H Askari-Nasab
International Journal of Mining, Reclamation and Environment 33 (1), 42-60, 2019
1632019
Mixed integer linear programming formulations for open pit production scheduling
H Askari-Nasab, Y Pourrahimian, E Ben-Awuah, S Kalantari
Journal of Mining Science 47, 338-359, 2011
1332011
Simulation and optimization approach for uncertainty-based short-term planning in open pit mines
SP Upadhyay, H Askari-Nasab
International Journal of Mining Science and Technology 28 (2), 153-166, 2018
1212018
Two-stage clustering algorithm for block aggregation in open pit mines
M Tabesh, H Askari-Nasab
Mining Technology 120 (3), 158-169, 2011
1202011
A mixed integer linear programming model for short-term open pit mine production scheduling
H Eivazy, H Askari-Nasab
Mining Technology 121 (2), 97-108, 2012
952012
A linear programming model for long-term mine planning in the presence of grade uncertainty and a stockpile
B Koushavand, H Askari-Nasab, CV Deutsch
International Journal of Mining Science and Technology 24 (4), 451-459, 2014
832014
A multiple objective transportation problem approach to dynamic truck dispatching in surface mines
AM Afrapoli, M Tabesh, H Askari-Nasab
European Journal of Operational Research 276 (1), 331-342, 2019
792019
Truck-shovel allocation optimisation: a goal programming approach
SP Upadhyay, H Askari-Nasab
Mining Technology 125 (2), 82-92, 2016
712016
A multi-step approach for block-cave production scheduling optimization
P Yashar, AN Hooman
International Journal of Mining Science and Technology 23 (5), 739-750, 2013
682013
A linkage of truck-and-shovel operations to short-term mine plans using discrete-event simulation
E Torkamani, H Askari-Nasab
International Journal of Mining and Mineral Engineering 6 (2), 97-118, 2015
662015
Large-scale open pit production scheduling using mixed integer linear programming
H Askari-Nasab, K Awuah-Offei, H Eivazy
International Journal of Mining and Mineral Engineering 2 (3), 185-214, 2010
662010
Dynamic shovel allocation approach to short-term production planning in open-pit mines
SP Upadhyay, H Askari-Nasab
International Journal of Mining, Reclamation and Environment 33 (1), 1-20, 2019
622019
Automatic creation of mining polygons using hierarchical clustering techniques
M Tabesh, H Askari-Nasab
Journal of Mining Science 49, 426-440, 2013
552013
Modelling open pit dynamics using discrete simulation
H Askari-Nasab, S Frimpong, J Szymanski
International Journal of Mining, Reclamation and Environment 21 (1), 35-49, 2007
542007
Oil sands mine planning and waste management using mixed integer goal programming
E Ben-Awuah, H Askari-Nasab
International Journal of Mining, Reclamation and Environment 25 (3), 226-247, 2011
522011
Integration of reclamation and tailings management in oil sands surface mine planning
MM Badiozamani, H Askari-Nasab
Environmental modelling & software 51, 45-58, 2014
472014
Production scheduling and waste disposal planning for oil sands mining using goal programming
E Ben-Awuah, H Askari-Nasab, K Awuah-Offei
Journal of Environmental Informatics 20 (1), 20-33, 2012
432012
Mixed–Integer Linear Programming formulation for block–cave sequence optimisation
Y Pourrahimian, H Askari–Nasab, D Tannant
International Journal of Mining and Mineral Engineering 4 (1), 26-49, 2012
392012
A multi–step approach to long–term open–pit production planning
M Tabesh, C Mieth, H Askari–Nasab
International Journal of Mining and Mineral Engineering 5 (4), 273-298, 2014
382014
Open pit optimisation using discounted economic block values
H Askari-Nasab, K Awuah-Offei
Mining Technology 118 (1), 1-12, 2009
382009
Le système ne peut pas réaliser cette opération maintenant. Veuillez réessayer plus tard.
Articles 1–20