Yacine Ouzrout
Yacine Ouzrout
DISP Laboratory - Université Lumière Lyon 2
Verified email at univ-lyon2.fr - Homepage
Title
Cited by
Cited by
Year
Collaboration and integration through information technologies in supply chains
G Neubert, Y Ouzrout, A Bouras
International Journal of Technology Management 28 (2), 259-273, 2004
492004
Multi-criteria decision making based on trust and reputation in supply chain
L Chang, Y Ouzrout, A Nongaillard, A Bouras, Z Jiliu
International Journal of Production Economics 147, 362-372, 2014
482014
An ontology-based knowledge management system for industry clusters
P Sureephong, N Chakpitak, Y Ouzrout, A Bouras
Global Design to Gain a Competitive Edge, 333-342, 2008
362008
Green media-aware medical IoT system
AH Sodhro, AK Sangaiah, S Pirphulal, A Sekhari, Y Ouzrout
Multimedia Tools and Applications 78 (3), 3045-3064, 2019
322019
PLM maturity model: a multi-criteria assessment in southern Italy companies
MM Savino, A Mazza, Y Ouzrout
International Journal of Operations and Quantitative Management 18 (3), 159-180, 2012
322012
Energy efficiency comparison between data rate control and transmission power control algorithms for wireless body sensor networks
AH Sodhro, L Chen, A Sekhari, Y Ouzrout, W Wu
International Journal of Distributed Sensor Networks 14 (1), 1550147717750030, 2018
312018
Knowledge management system architecture for the industry cluster
P Sureephong, N Chakpitak, Y Ouzrout, G Neubert, A Bouras
2007 IEEE International Conference on Industrial Engineering and Engineering …, 2007
312007
Negation Handling in Sentiment Analysis at Sentence Level.
U Farooq, H Mansoor, A Nongaillard, Y Ouzrout, MA Qadir
JCP 12 (5), 470-478, 2017
282017
Jointly identifying opinion mining elements and fuzzy measurement of opinion intensity to analyze product features
H Zhang, A Sekhari, Y Ouzrout, A Bouras
Engineering Applications of Artificial Intelligence 47, 122-139, 2016
252016
Sustainable Supply Chain Management: State of the Art
SRA Ratan, A Sekhari, M Rahman, AA Bouras
SKIMA 2010 193, 2010
232010
Performance assessment architecture for collaborative business processes in BPM-SOA-based environment
M Hachicha, M Fahad, N Moalla, Y Ouzrout
Data & Knowledge Engineering 105, 73-89, 2016
212016
Product quality pointers for small lots production: a new driver for Quality Management Systems
MM Savino, S Apolloni, Y Ouzrout
International journal of product development 5 (1-2), 199-211, 2008
212008
QoS ontology for service selection and reuse
S Chhun, N Moalla, Y Ouzrout
Journal of Intelligent Manufacturing 27 (1), 187-199, 2016
202016
A review of CPS 5 components architecture for manufacturing based on standards
A Ahmadi, C Cherifi, V Cheutet, Y Ouzrout
2017 11th International Conference on Software, Knowledge, Information …, 2017
192017
Supply chain management analysis: a simulation approach to the Value Chain Operations Reference (VCOR) model
Y Ouzrout, MM Savino, A Bouras, C Di Domenico
International Journal of Value Chain Management 3 (3), 263-287, 2009
152009
Sustainability consideration within product lifecycle management through maturity models analysis
H Zhang, Y Ouzrout, A Bouras, MM Savino
International Journal of Services and Operations Management 19 (2), 151-171, 2014
142014
PLM components selection based on a maturity assessment and AHP methodology
H Zhang, Y Ouzrout, A Bouras, A Mazza, MM Savino
IFIP International Conference on Product Lifecycle Management, 439-448, 2013
142013
Optimal inconsistency repairing of pairwise comparison matrices using integrated linear programming and eigenvector methods
H Zhang, A Sekhari, Y Ouzrout, A Bouras
Mathematical Problems in Engineering 2014, 2014
132014
Selection of product lifecycle management components based on AHP methodologies
H Zhang, Y Ouzrout, A Bouras, V Della Selva, MM Savino
2013 International Conference on Advanced Logistics and Transport, 523-528, 2013
132013
The sustainability of product compliance within lifecycle design
MM Savino, Y Ouzrout, A Mazza, S De Chiaro
International Journal of Product Lifecycle Management 6 (3), 288-309, 2013
132013
The system can't perform the operation now. Try again later.
Articles 1–20