Erlon Finardi
Erlon Finardi
Universidade Federal de Santa Catarina, LabPlan
Adresse e-mail validée de ufsc.br
Titre
Citée par
Citée par
Année
Solving the hydro unit commitment problem via dual decomposition and sequential quadratic programming
EC Finardi, EL da Silva
IEEE transactions on Power Systems 21 (2), 835-844, 2006
1642006
Sampling strategies and stopping criteria for stochastic dual dynamic programming: a case study in long-term hydrothermal scheduling
T Homem-de-Mello, VL De Matos, EC Finardi
Energy Systems 2 (1), 1-31, 2011
1092011
Solving the unit commitment problem of hydropower plants via Lagrangian relaxation and sequential quadratic programming
EC Finardi, EL Silva, C Sagastizábal
Computational & applied mathematics 24 (3), 317-342, 2005
1092005
On solving multistage stochastic programs with coherent risk measures
A Philpott, V de Matos, E Finardi
Operations Research 61 (4), 957-970, 2013
952013
Unit commitment of single hydroelectric plant
EC Finardi, EL Da Silva
Electric Power Systems Research 75 (2-3), 116-123, 2005
872005
A mixed integer linear programming model for the energy management problem of microgrids
D Tenfen, EC Finardi
Electric Power Systems Research 122, 19-28, 2015
782015
Hydro unit commitment and loading problem for day-ahead operation planning problem
EC Finardi, MR Scuzziato
International Journal of Electrical Power & Energy Systems 44 (1), 7-16, 2013
652013
Improving the performance of stochastic dual dynamic programming
VL De Matos, AB Philpott, EC Finardi
Journal of Computational and Applied Mathematics 290, 196-208, 2015
642015
A computational study of a stochastic optimization model for long term hydrothermal scheduling
VL de Matos, EC Finardi
International Journal of Electrical Power & Energy Systems 43 (1), 1443-1452, 2012
502012
Parallel processing applied to the planning of hydrothermal systems
EL da Silva, EC Finardi
IEEE Transactions on Parallel and Distributed Systems 14 (8), 721-729, 2003
502003
Practical aspects in solving the medium-term operation planning problem of hydrothermal power systems by using the progressive hedging method
MLL dos Santos, EL da Silva, EC Finardi, REC Gonçalves
International Journal of Electrical Power & Energy Systems 31 (9), 546-552, 2009
482009
Performance evaluation and energy production optimization in the real-time operation of hydropower plants
MM Cordova, EC Finardi, FAC Ribas, VL de Matos, MR Scuzziato
Electric Power Systems Research 116, 201-207, 2014
322014
Applying different decomposition schemes using the progressive hedging algorithm to the operation planning problem of a hydrothermal system
REC Gonçalves, EC Finardi, EL da Silva
Electric Power Systems Research 83 (1), 19-27, 2012
322012
A comparative analysis of different dual problems in the Lagrangian relaxation context for solving the hydro unit commitment problem
EC Finardi, MR Scuzziato
Electric power systems research 107, 221-229, 2014
262014
Solving the hydrothermal scheduling problem considering network constraints
FYK Takigawa, EL da Silva, EC Finardi, RN Rodrigues
Electric Power Systems Research 88, 89-97, 2012
262012
Lithium-ion battery modelling for the energy management problem of microgrids
D Tenfen, EC Finardi, B Delinchant, F Wurtz
IET Generation, Transmission & Distribution 10 (3), 576-584, 2016
192016
Assessing policy quality in a multistage stochastic program for long-term hydrothermal scheduling
VL de Matos, DP Morton, EC Finardi
Annals of Operations Research 253 (2), 713-731, 2017
162017
Solving the short-term scheduling problem of hydrothermal systems via Lagrangian relaxation and augmented Lagrangian
RN Rodrigues, EL da Silva, EC Finardi, FYK Takigawa
Mathematical Problems in Engineering 2012, 2012
162012
Assessing solution quality and computational performance in the hydro unit commitment problem considering different mathematical programming approaches
EC Finardi, FYK Takigawa, BH Brito
Electric Power Systems Research 136, 212-222, 2016
152016
Alocação de unidades geradoras hidrelétricas em sistemas hidrotérmicos utilizando relaxação lagrangeana e programação quadrática seqüencial
EC Finardi
Florianópolis, SC, 2003
142003
Le système ne peut pas réaliser cette opération maintenant. Veuillez réessayer plus tard.
Articles 1–20