Mehmet Savsar
Mehmet Savsar
Adresse e-mail validée de ku.edu.kw
Titre
Citée par
Citée par
Année
Simulation analysis of just-in-time production systems
M Savsar, A Al-Jawini
International Journal of Production Economics 42 (1), 67-78, 1995
841995
Effects of maintenance policies on the productivity of flexible manufacturing cells
M Savsar
Omega 34 (3), 274-282, 2006
812006
Reliability analysis of a flexible manufacturing cell
M Savsar
Reliability Engineering & System Safety 67 (2), 147-152, 2000
752000
Modeling of machine failures in a flexible manufacturing cell with two machines served by a robot
M Savsar, M Aldaihani
Reliability engineering & system safety 93 (10), 1551-1562, 2008
682008
Algorithms for real-time scheduling of jobs on mixed model assembly lines
A Bolat, M Savsar, MA Al-Fawzan
Computers & operations research 21 (5), 487-498, 1994
611994
Simulation analysis of a pull-push system for an electronic assembly line
M Savsar
International Journal of production economics 51 (3), 205-214, 1997
541997
Effects of kanban withdrawal policies and other factors on the performance of JIT systems—a simulation study
M Savsar
International Journal of Production Research 34 (10), 2879-2899, 1996
461996
Simulation analysis of maintenance policies in just‐in‐time production systems
M Savsar
International Journal of Operations & Production Management, 1997
441997
Performance analysis of an FMS operating under different failure rates and maintenance policies
M Savsar
International Journal of Flexible Manufacturing Systems 16 (3), 229-249, 2004
412004
Flexible facility layout by simulation
M Savsar
Computers & industrial engineering 20 (1), 155-165, 1991
411991
A stochastic model for the analysis of a two-machine flexible manufacturing cell
MM Aldaihani, M Savsar
Computers & Industrial Engineering 49 (4), 600-610, 2005
392005
Statistical modelling of properties of discharge pulses in electric discharge machining
C Cogun, M Savsar
International journal of Machine tools and Manufacture 30 (3), 467-474, 1990
281990
A neural network procedure for kanban allocation in JIT production control systems
M Savsar, MH Choueiki
International Journal of Production Research 38 (14), 3247-3265, 2000
272000
Stochastic models for reliable and unreliable flexible manufacturing cells with two machines and two robots
MM Aldaihani, M Savsar
International Journal of Industrial and Systems Engineering 3 (5), 610-624, 2008
252008
Two-stage production lines with a single repair crew
M SAVSAR, WE BILES
The International Journal of Production Research 22 (3), 499-514, 1984
231984
Simulation of tool change policies in a flexible manufacturing cell
F Abdulmalek, M Savsar, M Aldaihani
WSEAS Transactions on Systems 7 (3), 2546-2552, 2004
182004
Stochastic modelling and comparisons of two flexible manufacturing cells with single and double gripper robots
M Savsar, C Cogun
THE INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH 31 (3), 633-645, 1993
181993
Effects of degraded operation modes on reliability and performance of manufacturing cells
M Savsar
International Journal of Industrial and Systems Engineering 1 11 (1-2), 189-204, 2012
172012
Modelling of multi-stage production lines with maintenance operations
M Savsar*
International Journal of Computer Integrated Manufacturing 21 (4), 396-406, 2008
172008
Performance evaluation of a flexible manufacturing cell (FMC) by computer simulation
C Cogun, M Savsar
Modeling Measurement, & Control B 62 (2), 31-44, 1996
171996
Le système ne peut pas réaliser cette opération maintenant. Veuillez réessayer plus tard.
Articles 1–20